Nylon Line Installation; Front (Loop) Handle - Echo GT-225i Operator's Manual

Hide thumbs Also See for GT-225i:
Table of Contents

Advertisement

ASSEMBLY

Nylon Line Installation

1. Shut engine off. Lay unit on the ground with head assembly
up.
2. Remove old nylon line through center recess of head.
3. Thread new lines through outside holes (A) in housing until
ends meet in center of recess.
Note: Insert cutting line ends to center of head recess to insure
easy removal of used lines.

Front (Loop) Handle

Note: Label shows minimum spacing for front handle location.
Note: Front handle is pre-installed. Re-positioning and
tightening is all that is required.
1. Position front handle (A) in comfortable operating position
and tighten wing nut (B). The cutting attachment should be
5-7.5 cm (2-3 in.) above the ground and as level as possible.
14
A
MIN
SPACING
A
B
GT-225
X7722273204
© 04/2013 ECHO Inc.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt-225

Table of Contents