Purging of CD 3002 using air blower
1000
100
Flow rate vs length of the tube between the air blower and the sensor.
Mechanical
The air blower should be monted close to the sensor using bolts of the di-
mension M10 on the following positions
Position of mounting holes.
2
Maximum flow: Q 900 ltr/min
Maximum flow: Q
m
900 ltr/min
9
1
Length of tube [m]
226 mm
LDS 3000
Air blower
m n
10