Low Ice Production - Hoshizaki KM-500MAH Service Manual

Modular crescent cuber
Hide thumbs Also See for KM-500MAH:
Table of Contents

Advertisement

PROBLEM
l) Controller Board
m) Interlock Switch
[2] Water
a) Float switch
continues to
be supplied,
and the ice-
maker will not
b) Controller Board
start.
[3] Compressor
a) Wash Switch
b) High Pressure
Controller
c) Water Regulator
d) Overload Protector
e) Starter
f) Start Capacitor or
Run Capacitor
g) Magnetic Contactor
h) Compressor
i) Controller board
[4] Water
a) Water Solenoid
continues to
be supplied in b) Controller Board
freeze cycle.
POSSIBLE CAUSE
(Cleaning Valve)
Valve
1. Defective
1. "OFF" position.
2. Bad contacts.
1. Connector disconnected.
2. Leads opened or defective
switch.
3. Float does not move freely.
1. Defective.
1. "WASH" position.
2. Bad contacts.
1. Dirty Air Filter or
Condenser.
2. Ambient or condenser
water temp. too warm.
3. Refrigerant overcharged.
4. Condenser water pressure
too low or off. [Water-
cooled model only].
5. Fan not operating. [Except
water-cooled model].
6. Refrigerant line or
components plugged.
1. Set too high.
1. Bad contacts.
2. Voltage too low.
3. Refrigerant overcharged or
undercharged.
4. Line Valve continues to
close in freeze cycle and
Overload Protector
operates.
1. Bad contacts.
2. Coil winding opened.
1. Defective.
1. Bad contacts.
2. Coil winding opened.
1. Wiring to Compressor.
2. Defective.
3. Protector tripped.
1. Defective.
1. Diaphragm does not close.
1. Defective.
42
REMEDY
1. See "II.2[e] CHECKING
CONTROLLER BOARD."
1. Move to "ON" position.
2. Check for continuity and
replace.
1. Place in position.
2. Check and replace.
3. Clean or replace.
1. Replace.
1. Move to "ICE" position.
2. Check and replace.
1. Clean.
2. Reduce ambient temp.
3. Recharge.
4. Check and get
recommended pressure.
5. See chart 1 - [6].
6. Clean and replace Drier.
1. Adjust lower.
1. Check for continuity and
replace.
2. Increase voltage.
3. Recharge.
4. Check Line Valve's
operation in freeze cycle
and replace.
1. Check and replace.
2. Replace.
1. Replace.
1. Check for continuity and
replace.
2. Replace.
1. Check for loose
connection or open, and
replace.
2. Replace.
3. Reduce temperature.
1. See "II.2. [e] CHECKING
CONTROLLER BOARD."
1. Check for water leaks
with icemaker off.
1. See "II.2.[e] CHECKING
CONTROLLER BOARD."

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Km-500mwhKm-500mrh

Table of Contents