This appliance must be installed in accordance with the
manufacturer's instructions, local gas fitting regulations and
requirements of the A .G .A . 601 Installation Code . All burner
adjustments and settings should be made by a qualified gas
technician .

Gas Connection

The local gas authority should be consulted at the
installation planning stage in order to establish the
availability of an adequate supply of gas and to ensure
that the meter is adequate for the required flow rate . The
pipe work from the meter to the appliances must be of an
appropriate size .
All fixed (non-mobile) appliances MUST be fitted with a
manual gas-cock upstream of the appliance to provide a
means of isolation for servicing or cleaning purposes . A
union or similar means of disconnection must be provided
between the gas-cock and the appliance .
A manually operable valve must be fitted to the gas supply
to the kitchen to enable it to be isolated in an emergency .
Wherever practical, this shall be located either outside the
kitchen or near to an exit in a readily accessible position .
Where it is not practical to do this, an automatic isolation
valve system shall be fitted which can be operated from a
readily accessible position near to the exit .
At locations where the manual isolation valve is fitted or
the automatic system can be reset a notice MUST be fitted
stating:
TESTING & ADJUSTMENT

Testing

All fittings and pipe connections must be tested for
leaks . Use approved gas leak detectors, soap solution or
equivalent, checking over and around all the fittings and
pipe connections . DO NOT USE A FLAME! Accessibility to
all gas lines and fittings require that valve panel(s), lower
front panel(s), and/or oven rack(s) be removed . All parts
removed, (including fasteners), should be stored safely for
re-installation .
Part # 4515558 (02/29/08)
"ALL DOWNSTREAM BURNER AND PILOT VALVES MUST
BE TURNED OFF PRIOR TO ATTEMPTING TO RESTORE THE
SUPPLY . AFTER EXTENDED SHUT OFF, PURGE BEFORE
RESTORING GAS . "
Before assembly and connection check gas supply .
A . The type of gas for which the unit is equipped is stamped
on the data plate located behind the lower front panel .
Connect a unit stamped "NAT" only to natural gas;
connect one stamped "PRO" only to propane gas .
B . If it is a new installation have the gas authorities check
meter size and piping to assure that the unit is supplied
with necessary amount of gas pressure required to
operate the unit .
C . If it is additional or replacement equipment have the gas
authorities check pressure to make certain that existing
meter and piping will supply fuel to the unit with no
more than 0 .15 kPa pressure drop .
NOTE: When checking gas pressure, be sure that all other
equipment on the same gas line is on .
The appliance and its individual shut-off valve must be
disconnected from the gas supply piping system during
any pressure testing of that system pressures in excess of
 .45kPa .
Adequate clearance must be provided for servicing and
proper operation .
THIS APPLIANCE IS NOT RECOMMENDED FOR RESIDENTIAL
INSTALLATION .
1 Be sure that all valves and thermostats are in the "OFF"
position .
2 . Turn on the main gas supply valve . Light all top section
pilots .
 . Leak test all valves and fittings as described at the
beginning of this section . Correct any leaks as required
and recheck .