GE AEE08 Owner's Manual And Installation Instructions page 13

Table of Contents

Advertisement

Available languages

Available languages

Through-the-Wall
Installation
Instructions-Optional
The case may be installed
through-the-wall
in
both existing
and new construction.
Read completely,
then follow step-by-step.
NOTE: Obtain all materials
locally for mounting
the air conditioner
through-the-wall.
1_1IMPORTANT
[]
@
Through-the-wall
installation
is not appropriate
if any of the side or top louvers in the case will
be obstructed
by the wall.
All side and top louvers in the case must project
on the outdoor side of the wall.
The room side of the case must project into the
room far enough to maximize the balance of the
unit.
The case must be installed level from side-to-
side and with a slight tilt from front to rear. Use
a level; no more than a 1/2 bubble will be the
correct case slant to the outside.
Lintel angle is required to support bricks or
blocks above opening.
Flashing is required and should extend the
length of the opening to ensure no inside cavity
leakage occurs.
Remove the air conditioner from the case.
For specific instruction, refer to the Window
Installation Instructions.
Make certain that a wall receptacle is available
close to the hole location or make arrangements
to install a receptacle.
:i
',
i÷_.
[]
Place the case in the wall opening and place wood
support strips between the case bottom and the
flashing on both sides of the bottom rail. They
should be the same height as the bottom rail and
the same length as the wall opening.
m IMPORTANT (cont.)
r_
Secure with 14 wood screws anchored at least an
inch into the wall support structure.
NOTE: Drill pilot holes, if necessary, for proper
installation. If the frame is oversized, use shims to
prevent case distortion.
13
FINISH THE WALL OPENING
Caulk all four sides on the outdoor side of the case
to prevent moisture from getting through to the
interior wall. Use of flashing (drip rail) will further
prevent water from dripping inside the wall and
down the outside of the building.
Place the air conditioner into the case.
Lintel angle
Plaster line
Caulking
Trim molding (if
desired)
OUTSIDE
Air louvers (top j
and sides must/_
project on thev
outdoor side of
the wall)
INSIDE
Bottom rail
J
Wood filler and
caulking (above an
below the flashinc
Flashing
(Drip rail)
Bottom
rail
Flashing
(Drip rail)
Wood
support
strips
r_
For specific instruction, refer to the Window
Installation Instructions.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aee12

Table of Contents