Duties Of The Responsible Party - Foxconn NVLAP FCC DoC Test Manual

Switching power supply
Table of Contents

Advertisement

PEP
Testing
12-3Fl, No. 27-1, Lane 169, Kang-Ning St., Hsi-Chih,
Taipei Hsien, Taiwan, R. O. C.
TEL: 886-2-26922097
REPORT NO. :E930560

14. Duties of The Responsible Party

The responsible party upon signing or accepting the Declaration of Conformity as specified in
Section 2.906 of the FCC Rules hereby agrees to the duties listed below.
2.1073(a).
The responsible party warrants that each unit of equipment marketed under DoC is identical to the unit
tested and found acceptable with the standards and that the records maintained by the responsible party
continue to reflect the equipment being produced is within the variation that can be expected due to
quantity production and testing on a statistical bass.
2.1073(b).
The responsible party must have a written statement from the manufacturer or accredited test
laboratory that the equipment complies with the appropriate technical standards.
2.1073(c).
In case of transfer of control of equipment, as in the case of sale or merger, the new responsible party
shall bear the responsibility of continued compliance of the equipment.
2.1073(d).
Equipment shall be retested if any modifications or changes are made that could adversely affect the
emanation characteristics of the equipment.
2.1073(e).
If any modifications or changes made by anyone other than the responsible party, the party making the
modifications of changes, if located within the U.S., becomes the new responsible part. The new
responsible party must comply with all provisions for the DoC, including having test data on file
demonstrating that the product continues to comply with all of the applicable technical standards.
2.1075(a)(1).
The responsible party shall maintain records of the original design drawings and specifications and all
changes made to the product that may affect compliance.
2.1075(a)(2).
The responsible party shall maintain records of the procedures used for production inspection and
testing to insure the conformance with the FCC Rules.
2.946(a)(1).
The test report data shall be provided to the FCC within 14 days of delivery of request. The test
sample(s) shall be provided within 60 days of delivery of request.
2.946(b)
In case involving harmful interference or safety of life or property, the production sample must be
provided within 60 days, but not less than 14 days. Failure to comply with such a request with the
time frame shown may be cause for forfeiture, pursuant to Section 1.80 of Part 1 of the FCC Rules.
*The Responsible Party is the manufacturer, system integrator, or the importer as defined in Section
2.909 of the FCC Rules. The Rules. The Responsible Party for a DoC must be located within the
United States as specified in Section 2.1077.
Laboratory
FAX: 886-2-26956236
Page 25 of 31
NVLAP LAB CODE: 200097-0
-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents