Fujitsu PRIMECENTER M1 19-inch Rack User Manual page 95

Rack system for primergy, primequest, bs2000, storage
Table of Contents

Advertisement

7.3.6.1
Installation options for 700 mm wide asymmetrical racks
Rack height
Installation direction vertically
42 HU
ok
24 HU
ok
Table 16: Installation options for 700 mm wide asymmetrical racks
Performing the task
Ê Install the PDU brackets as described on
Figure 63: Single-phase 10-way socket strip mounted in a 700 mm wide asymmetrical rack
Ê Screw each socket strip with 2 screws onto the PDU brackets.
Power Distribution
Installation direction horizontally
ok
ok
page
69.
95

Advertisement

Table of Contents
loading

Table of Contents