Example of total operating Procedure

This chapter introduces the operating method of GUI.
5.5.1

Hardware preparation

Before operating GUI, prepare hardware according to the following procedure.
1. Install the FTDI driver (Only once)
2. Prepare the hardware environment
3. Connect the wires among the hardware board, FTDI device, PC and so on.
4. Turn on the Hardware power.
5.5.2

GUI software operating step

The following part is an example of GUI operating method.
(1) PC and hardware communication Connect:
First, click Connect button in Main Window to connect PC with hardware (1 in
). If connection succeeds, the color of Connect button changes from red to
5-10
green. The button text changes from Disconnect to Connected.