Desa C36EMW Installation Instructions Manual page 7

36” circulating firebox
Table of Contents

Advertisement

If the adapter is needed, secure it onto the firestop using holes
provided (see figure 10). The row of holes on the sides of the
thimble is provided to allow for pitch variances. Position the
firestop assembly and thimble to desired angle and secure with
screws provided.
Insert the thimble and firestop into the
prepared opening and secure to the ceiling by nailing through
the firestop flanges. The thimble should be even with or
above the roofline. Thimble extensions are available (as an
option) when required. See "accessories" on page 12.
NOTE: If there is a second story in the home, firestop
spacer V3600FS-8DM will be required.
Spacer".
INSTRUCTIONS WHEN ELBOW OFFSET (30E-8DM)
OF CHIMNEY IS NEEDED
TO INSTALL ELBOWS
1. To achieve desired offset, you may install combinations of
12", 18", 24", 36" and 48" length of double wall pipe (SEE
SINGLE OFFSET CHARTAND FIGURE 12).
OFFSET CHART
OFFSET
RISE
A
B
48"
4 - 3/8
16 -3/8
9 - 3/4
25 - 1/2
12 - 3/4
30 - 3/4
15
34 - 3/4
18
40
21 - 1/4
46 - 1/4
23 - 3/4
49 - 1/4
27 - 3/4
56 - 3/4
1
30
60 - 3/4
33
66
1
36
71
1
38 - 1/4
75
41 - 1/4
80 - 1/4
45
86 - 3/4
46 - 3/4
89 - 1/2
1
51
97
1
53 - 1/4
101
56 - 1/4
106 - 1/4
2
59 - 1/4
111 - 1/2
1
61 - 3/4
115 - 1/2
2
64 - 3/4
120 - 3/4
2
68 - 1/4
127
1
70
130
2
74 - 1/4
137 - 1/2
1
76 - 3/4
141 - 1/2
1
79 - 3/4
146 - 3/4
2. Chimney weight above offset rests on return elbow.
Straps must be securely nailed to rafters or joists (see figure
12, details a & b).
3. Maximum length of pipe between supports (return elbow or
12S-8DM) is 2' of angle run.
Figure 11
CEILING SUPPORT PIPE
See "Firestop
CHIMNEY LENGTH
36"
24"
18"
12"
ELBOW SET ONLY
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
1
1
2
1
1
2
1
2
1
4
Figure 12
FIRESTOP SPACERS (V3600FS-8DM)
Firestop spacers are required at each point where the chimney
penetrates a floor space. Their purpose is to establish and
maintain the required clearance between the chimney and the
combustible materials.
framed opening into a living space above, the firestop must be
placed onto the ceiling from below as shown in figure 13.
Figure 13
PENETRATING THE ROOF
To maintain a 1-inch clearance to the pipe on a roof with a
pitch, a rectangular opening must be cut.
STEP 1: Determine the center point through which the pipe
will penetrate the roof.
STEP 2: Determine the center point of the roof. Pitch is the
distance the roof drops over a given span, usually 12 inches.
A 6/12 pitch means that the roof drops 6 inches for each 12
inches one measure horizontally down from the roof rafters.
STEP 3: Use the roof opening chart (figure 14) to determine
the correct opening length and flashing required.
STEP 4: Remove the shingles around the opening measured
and cut out this section.
STEP 5: Add the next sections of the pipe until the end
penetrates the roofline.
clearances are maintained.
sections of double wall pipe until pipe is a minimum of 30
inches above the highest point of the roof cutout. Termination
and chimney must extend a minimum of 36 inches above the
highest point where it passes through roof.
- 6 -
All joints (where two pipes are
joined) should be secured with
two screws, only on the outer
pipe, and shall not penetrate
the inner stainless.
ELBOW OFFSET
When the pipe passes through a
FIRESTOP SPACER
Check to see that the proper
Extend chimney by adding
For more information, visit www.desatech.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents