Table Of Contents; Natural Gas - Baxi 105 HE Installation And Servicing Instructions

Gas fired wall mounted condensing boiler
Table of Contents

Advertisement

Natural Gas

Baxi Combi 105 HE
G.C.N
47 075 18
o
The Benchmark Scheme
Benchmark places responsibilities on both manufacturers and installers. The
purpose is to ensure that customers are provided with the correct equipment for
their needs, that it is installed, commissioned and serviced in accordance with the
manufacturer's instructions by competent persons and that it meets the
requirements of the appropriate Building Regulations. The Benchmark Checklist
can be used to demonstrate compliance with Building Regulations and should be
provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work
in accordance with the Benchmark Code of Practice which is available from the
Heating and Hotwater Industry Council who manage and promote the Scheme.
Visit www.centralheating.co.uk for more information.
Building Regulations and the Benchmark Commissioning
Checklist
Building Regulations (England & Wales) require notification of the
installation of a heating appliance to the relevant Local Authority Building
Control Department. From 1 April 2005 this can be achieved via a
Competent Persons Self Certification Scheme as an option to notifying
the Local Authority directly. Similar arrangements will follow for Scotland
and will apply in Northern Ireland from 1 January 2006.
The Health & Safety Executive operates the 'Gas Safe Register', a
self-certification scheme for gas heating appliances.
These arrangements represent a change from the situation whereby
compliance with Building Regulations was accepted as being
demonstrated by completion of the Benchmark Logbook (which was
then left on site with the customer).
With the introduction of Self Certification Schemes, the Benchmark
Logbook is being withdrawn. However, a similar document in the form
of a commissioning checklist and service interval record is incorporated
at the back of these instructions.
This company is a member of the Benchmark initiative and fully supports
the aims of the programme. Its aim is to improve the standards of
installation and commissioning of central heating systems in the UK and
to encourage the regular servicing of all central heating systems to
ensure safety and efficiency.
Building Regulations require that installations should comply with
manufacturer's instructions. It is therefore important that the
commissioning checklist is completed by the installer. The relevant
section of Building Regulations only relates to dwellings. Therefore the
checklist only applies if the appliance is being installed in a dwelling or
some related structure.
The flowchart opposite gives guidance for installers on the process
necessary to ensure compliance with Building Regulations.
0086
2
© Baxi Heating UK Ltd 2011
© Baxi Heating UK Ltd 2011 All rights reserved. No part of this publication may be reproduced or
transmitted in any form or by any means, or stored in any retrieval system of any nature (including in any
database), in each case whether electronic, mechanical, recording or otherwise, without the prior written
permission of the copyright owner, except for permitted fair dealing under Copyrights, Designs and
Patents Act 1988.
Applications for the copyright owner's permission to reproduce or make other use of any part of this
publication should be made, giving details of the proposed use, to the following address:
The Company Secretary, Baxi Heating UK Limited,
Brooks House, Coventry Road, Warwick. CV34 4LL
Full acknowledgement of author and source must be given.
WARNING: Any person who does any unauthorised act in relation to a copyright work may be liable to
criminal prosecution and civil claims for damages.
Contents
Section
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
Page
4
6
7
8
9
10
11
14
18
23
27
32
34
35
37
47
48
53
54
ISO 9001
FM 00866

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Main combi 30 heCombi 105 he

Table of Contents