Setting Up The Workstation; Ensuring Proper Ventilation - HP Z600 - Workstation - 6 GB RAM User Manual

Hp z workstation series user guide
Hide thumbs Also See for Z600 - Workstation - 6 GB RAM:
Table of Contents

Advertisement

3

Setting up the workstation

This chapter describes how to set up the workstation, and includes these topics:
Ensuring proper ventilation on page 19
Setup procedures on page 20
Converting to desktop configuration on page 22
Adding monitors on page 24
Accessibility on page 27
Security on page 27
Product recycling on page 27

Ensuring proper ventilation

Proper ventilation for the system is important for workstation operation. Follow these guidelines to
ensure adequate ventilation:
Operate the workstation on a sturdy, level surface.
Place the workstation in an area with adequate ventilation. Provide at least 15.24 CM (6 inches)
of clearance at the front and back of the workstation as shown in the following figure.
Your workstation might look different than the one shown.
Figure 3-1
Ensure that the ambient air temperature surrounding the workstation falls within the published limit.
ENWW
Topics
Proper workstation ventilation
Ensuring proper ventilation
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z800 - workstation - 6 gb ramZ400Z600Z800

Table of Contents