GE GTDL740GDWW Use And Care Manual page 13

Ge 7.8 cu. ft. capacity gas dryer with 150 ft. long venting
Hide thumbs Also See for GTDL740GDWW:
Table of Contents

Advertisement

Available languages

Available languages

5
Remove and swap the 2 cover caps and door handle
from the outer door:
A. Squeeze the tabs on the inside of the door handle
clips. Push clips through the outer door.
B. Squeeze the tabs on the inside of the cover caps. Push
caps through the outer door.
Inside of door
Cover cap
C. Push the door handle clips into the openings on the
opposite side of the outer door making sure you flip
the handle so it curves to the inside.
D. Push the cover caps into the openings on the outer
door where the handle was removed.
Inside of door
Door handle clip
Door handle
Door handle clip
Cover cap
Door handle
6
With the cover caps and door handle in place, mount the
inner door back into the outer door with the screws
removed in step 4. Make sure you mount the hinges on
the side opposite the handle.
Inside screws
Edge screws
Edge
screws
7
Mount the assembled door on the 2 upper left side hinge
screws installed in step 2. Move the hinge screws
loosened in step 3 into the lower left side screw holes
and firmly tighten all 4 screws.
Door
8
Install the 4 plastic caps removed in step 1 into the 4
right side front panel holes.
NOTE: To return the door to the original setup, follow these
instructions, swapping "left" and "right".
When you finish
Plug the dryer back into its electrical outlet.
GEAppliances.com
Inside screws
Door hinge
screws
Edge
screws
Handle
Hang door and
tighten screws
13

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Gtdl740edwwGtdp740gdwwGtdp740edww

Table of Contents