Toshiba M500 ST5405 - Satellite - Core 2 Duo 2.13 GHz Maintenance Manual page 314

Maintenance manual
Hide thumbs Also See for M500 ST5405 - Satellite - Core 2 Duo 2.13 GHz:
Table of Contents

Advertisement

4 Replacement Procedure
Fixing the PCB and bezel
1. Fixing the PCB and bezel with four screws at the right side and left side (four points)
as shown in the following figure.
CAUTION: 1. The tightening torque must be 0.167 N m (1.7kgf
There shall not be screw floating.
2. Use an insert bit of point size 0 for the Philips screwdrivers.
Attaching tapes and insulation sheet
1. Attach the double-sided tape of insulation sheet as shown in the following figure.
CAUTION: When attaching tape and insulation sheet, be careful not to damage the
PCB, cell and B/L.
Insulation sheet with
double-sided tape of bezel
CAUTION Label
Figure 4-58 Replacing TMD fluorescent lamp (10)
4-84
[CONFIDENTIAL]
Tape on the side of bezel
Insulation sheet
with double-sided
tape of bezel
4.29 Fluorescent Lamp
cm) for all the screws.
Insulation sheet
Insulation sheet with
double-sided tape of bezel
Serial Label
Disposal Label
PORTÉGÉ M500 Maintenance Manual (960-559)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Satellite u200Tecra m6Portege m500

Table of Contents