Throttle Linkage And Ignition Leads; Front Handle Installation - Echo SRM-2100, 2110 Operator's Manual

Echo grass trimmer/brush cutter operator's manual
Hide thumbs Also See for SRM-2100, 2110:
Table of Contents

Advertisement

THROTTLE LINKAGE AND IGNITION LEADS

Tools Required: 8mm x 10mm open end wrench (all models), 3mm Allen
Wrench.
1. Close choke and remove air filter cover.
2. Loosen nut (A) and place threaded end of throttle linkage in
bracket slot. Finger tighten nut (A).
3. Place inner cable in slot of carburetor swivel (B) and tighten
nut (A).
4. Check throttle for freedom of movement and make sure it returns
to idle position. If the throttle linkage does not allow the carbure-
tor throttle plate (C) to return to idle against idle screw (D),loosen
linkage nuts; turn throttle linkage nut (A) counter clock
until throttle plate (C) just rests against idle screw (D). Hold
linkage nut (A) from turning and tighten other linkage nut.
5. Connect ignition leads (C). SRM-2100 has one connector
terminal pair and one ring terminal which attaches under fan
terminal screw (C).
6. Install air filter and cover.

FRONT HANDLE INSTALLATION

Tools Required: Screwdriver.
Parts Required: Front Handle, Handle Support, Four (4) 5mm x 35mm
screws with captivated washers, four (4) 5mm nuts.
1.
Position front handle for comfortable operation and secure screws.
G
T
RASS
RIMMER
O
PERATOR
wise
/B
C
RUSH
UTTER
'
M
S
ANUAL
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents