9.Installation

Installation
Operation
1 Unpacking
2 Printer installation
3 Connecting damper tubes*
4 Initial ink filling
5 Parallelism adjustment of feeder
6 M-GAP DEFAULT, HORIZONTAL adjustment
7 RIP software installation/Connection check
8 Explanation of how to use the machine
*Damper tubes are disconnected when the machine is installed in order to stabilize the
head firing during ink filling. Please refer to the service notes for service operation.
This work is not necessary on the machines with the serial numbers below.
SG2-300 : KEB0198, KEC0216 or later
Rev.1.2
SG2-540 : KEC0272 or later
SG2-640 : KEB0200, KEC0205 or later
Listed time is just a reference. Actual working time may vary depending on the
installation environment.
For ink filling, message that urges you to insert the cleaning liquid appears before ink type selection.
CAUTION
After filling ink, adjustments of [M-GAP DEFAULT] and [HORIZONTAL] are needed.
Description
Required time
Accumulated time
20 min.
30 min.
10 min.
20 min.
10 min.
10 min.
15 min.
Depending on the
Depending on the
user
CONFIDENTIAL
20 min.
50 min.
60 min.
80 min.
90 min.
100 min.
115 min.
user