Page 3
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ IMPORTANT PRECAUTIONS LANGUAGE THIS SERVICE MANUAL IS AVAILABLE IN ENGLISH ONLY. IF A CUSTOMER’S SERVICE PROVIDER REQUIRES A LANGUAGE WARNING OTHER THAN ENGLISH, IT IS THE CUSTOMER’S RESPONSIBILITY TO PROVIDE TRANSLATION SERVICES.
Page 4
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ PRESENTE MANUALE MANUTENZIONE È DISPONIBILE AVVERTENZA SOLTANTO IN INGLESE. SE UN ADDETTO ALLA MANUTENZIONE ESTERNO ALLA GEMS RICHIEDE IL MANUALE IN UNA LINGUA DIVERSA, IL CLIENTE È TENUTO A PROVVEDERE DIRETTAMENTE ALLA TRADUZIONE.
Page 5
All packages should be closely examined at time of delivery. If damage is apparent, write “Damage In Shipment” on ALL copies of the freight or express bill BEFORE delivery is accepted or “signed for” by a GE representative or hospital receiving agent. Whether noted or concealed, damage MUST be reported to the carrier immediately upon discovery, or in any event, within 14 days after receipt, and the contents and containers held for inspection by the carrier.
Page 6
China cable requirements added February 2006 Table base plate information corrections. Corrections and additional tube angulations information. March 2006 Precision RXi Air Kerma Scatter Rates. Broadband information for Europe July 2006 Positioner tabletop longitudinal displacement; room layout. September 2006 Generator 50 kW deleted, moving the Bucky, room layout.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Table of Contents Preface............................... 10 1.1. Publication Conventions......................10 1.2. Safety & Hazard Information ..................... 10 1.3. Hazard Messages ........................12 1.4. Text Format of Signal Words ....................12 1.5.
Page 8
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Planning Electrical Connections ......................63 6.1. Routing Cables.......................... 63 6.1.1. General ..........................63 6.1.2. Conduit ..........................63 6.1.3. Floor Ducts ........................63 6.1.4. Power Distribution ......................63 6.1.5.
Page 9
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 11.2.6. Monitor Suspension......................102 11.2.7. Non-tilting Wallstand....................... 105 11.2.7.1. Slab on Grade......................105 11.2.7.2. Upper Floor ......................106 11.2.8. Tilting Wallstand ......................107 11.2.8.1. Slab on Grade......................107 11.2.8.2.
Text (Hazard) styles are applied to the paragraph contents that are applicable to each specific safety statement. Precision RXi Air Kerma Scatter Rates 100cm 75cm...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 1.3. Hazard Messages Any action that will, could or potentially cause personal injury will be preceded by the safety alert symbol and an appropriate signal word. The safety alert symbol is the triangle with an exclamation mark within it. It’s always used next to the signal word to indicate the severity of the hazard.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 1.5. Symbols and Pictorials Used The following Symbols and Pictorials are be used in this publication. These graphical icons (symbols) may be used to make you aware of specific types of hazards that could possibly cause harm.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 2. Publication Conventions 2.1. General Paragraph and Character Styles Prefixes are used to highlight important non-safety related information. Paragraph prefixes (such as Purpose, Example, Comment or Note) are used to identify important but non-safety related information. Text styles are also applied to text within each paragraph modified by the specific prefix.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Example: Variable Input This paragraph’s font represents computer input that can vary from application to application or system to system. With variable text, the user is required to supply system dependent input or information. Variable input sometimes is placed between greater-than and less-than operators.
This document is intended as a guide and informational resource for planning and properly preparing a location for the installation of a Precision RXi R&F system. This document is intended to assist the customer and installer in properly preparing a site for product installation.
3.5. What You Will Receive (System Components) The Precision RXi R&F System is divided into sub-systems: Precision RXi Remote R&F Table with SFD and Positioner Cabinet Compact Generator Cabinet Digital or Analog Imaging System The following options are also available: Integrated Console (in case the integrated console is not required the different elements will be delivered separately.
Page 18
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Integrated Console with Digital subsystem, table Double Monitor Suspension console and generator touch screen. Product Name Catalog Number 90/30 Non-elevating Tilting Table S1303RA 90/90 Elevating Table S1303RB Integrated Control Room Console Stand...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 4. Suite/Room Requirements 4.1. Environmental 4.1.1. Relative Humidity and Temperature RELATIVE HUMIDITY (NON TEMPERATURE CONDENSING COMPONENT STORAGE IN-USE STORAGE IN-USE MIN. MIN. MAX. MIN. MAX. MIN. MAX. -20°C 60°C...
4.1.4. Magnetic/Electrical Field Sensitivity and Electromagnetic Emissions All the products or components of the Precision RXi R&F system meet EMI and EMC requirements 46-319024 and IEC 601-1-2 (International). Because X-ray equipment produces radiation, special precautions may need to be taken or special site modifications may be required.
However, for a system with OTS and wallstand, full range of wallstand use is achieved with a ceiling height of 290 cm. A higher height will limit the lower end of the useful travel range of the wallstand. For all OTS dimensions and travels make reference to par. 5.2.10, page 50. Minimum Precision RXi Precision RXi ceiling Parameter...
Make sure to obtain data on compression strength of the concrete before using floor anchors. 4.2.3.4. Ceiling Aluminum rails support the Overhead Tube Suspension and In-Room LCD Monitor bridge used in Precision RXi R&F system X-ray rooms. Reference - For details on ceiling requirements for stationary rails, refer to Chapter 3 – System Physical Characteristics.
IRECTION EVISION _____________________________________________________________________________________________ 5. System Physical Characteristics Refer to this section for the dimensional drawings of the components of the Precision RXi R&F System. Note: Drawings are not to scale. Dimensions are called out on each drawing. 5.1. Dimension Overview...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.1.1. Single monitor suspension Page 24 / 111 June 2009...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2. Dimensioned Drawings 5.2.1. Table 5.2.1.1. -30/+90 Non-Elevating Table Table model with patient tabletop fixed height. Page 26 / 111 June 2009...
Page 27
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.1.1.1. -30/+90 Non-Elevating Table cont. (Patient step) June 2009 Page 27 / 111...
Page 28
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.1.1.2. -30/+90 Non-Elevating Table cont. The distance between the table cabinet and the table cables support can not be more than 7 meters. The distance between the generator cabinet and the table cables support can not be more than 5 meters.
Page 29
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.1.1.3. -30/+90 Non-Elevating Table cont. Plate supplied as a serial standard accessory (screws and bolts are supplied with base plate) Fixation plate for non-elevating table (weight: 114 kg).
Page 30
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.1.1.4. -30/+90 Non-Elevating Table cont. Not elevating tables fixation by means of small blocks Shim 0.5 mm 1.0 mm 1.5 mm 6 shims are provided for each measure specified in the table. These Fig.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.1.2. -90/+90 Elevating Table Table model with patient tabletop elevating device. June 2009 Page 31 / 111...
Page 32
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.1.2.1. -90/+90 Elevating Table cont. (Patient step) Page 32 / 111 June 2009...
Page 33
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.1.2.2. -90/+90 Elevating Table cont. The distance between the table cabinet and the table cables support can not be more than 7 meters. The distance between the generator cabinet and the table cables support can not be more than 5 meters.
Page 34
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.1.2.3. -90/+90 Elevating Table cont. Fixation by means of small blocks. Fixation plate for elevating table (weight: 100 kg). Concrete floor, min. height: 200mm (concrete as per the Table “IN 1045 BN350”).
Page 35
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.1.2.4. -90/+90 Elevating Table cont. Elevating tables fixation by means of small blocks Shim 0,5 mm 1 mm 1,5 mm 6 shims are provided for each measure specified in the table. These Fig.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.2. Positioner Cabinet 1960mm 340mm 600mm All dimensions in mm Cables can be routed into the cabinet from either side, back or directly into the button of the cabinet. Both side openings and the back opening are the same size.
Page 37
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ φ13mm 227mm 487mm Cabinet Anchoring Dimensions Power cabinet fixed to the wall by anchors and bolts 400 mm 1978 mm from Brackets floor to the holes brackets support...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.3. Generator Cabinet Note: All dimensions in mm Generator Clearances Page 38 / 111 June 2009...
Page 39
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ REAR Generator Anchoring Locations. Note: The flanges indicated by dotted lines show optional positioning of the flanges at those corners 32.5 Room interface board; TDI board; GIM connection;...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.5. LCD Monitor Note: Monitor stand shown is only required when integrated console is not selected. Note: All dimensions in mm Weight 9.7 kg. June 2009 Page 41 / 111...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.6. Positioner Console Note: Positioner console must be positioned by the customer if the integrated console is not selected. 650 mm 150 mm 500 mm 5.2.7. Generator Touch Screen Note: Generator Touch Screen must be positioned by the customer if the integrated console is not selected.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.8. Monitor Suspension 5.2.8.1. Ceiling suspension including bridge and carriage • Monitor suspension is mounted on the same bridge and carriage as used with the Overhead Tube Suspension (make reference to 5.2.11 page 52).
Page 44
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Page 44 / 111 June 2009...
Page 45
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ SAFETY AREA IN COMPLIANCE WITH EN 292 RULES June 2009 Page 45 / 111...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.8.2. Suspension fixed on ceiling Page 46 / 111 June 2009...
Page 47
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ IMPORTANT For details, please make reference to PORTEGRA2 Installation Manual PTZ15002E by MAVIG WARNING! PAY ATTENTION! BEFORE COMMANDING ANY SYSTEM MOVEMENT, YOU SHALL CHECK THE POSITION OF THE MONITOR SUSPENSION.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.9. Monitor Cart Single Double Page 48 / 111 June 2009...
Page 49
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ June 2009 Page 49 / 111...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.11. Bridge and Rails (for OTS and/or Monitor Suspension) The stationary rails utilize extruded aluminum channels that are ceiling mounted and are 4400mm in length. The spacing between these stationary rails accommodates an overhead mounted bridge structure. The bridge length is 3000 mm and the bridge width is 670 mm.
Page 53
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ June 2009 Page 53 / 111...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.11.1. Rail Mounting Cod. CSA012 (standard) Page 54 / 111 June 2009...
Page 55
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.11.1.1. Rail Mounting cont. Cod. CSA027 (optional) June 2009 Page 55 / 111...
Page 56
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.11.1.2. Rail Mounting cont. Note: The distance between bolts can vary from 600mm to 840mm as shown in the layout due to the slot design of the rail support positions.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.12. Tilting Wallstand Center of gravity June 2009 Page 57 / 111...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.13. Non-Tilting Wallstand Center of gravity Page 58 / 111 June 2009...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.14. Wallstand Base Plate and Wall Bracket June 2009 Page 59 / 111...
Page 60
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Page 60 / 111 June 2009...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.14.1. Wallstand Mounting The wallstand is mounted to the floor using four M10 bolts. Holes for anchors must be 16mm in diameter and 80mm deep. If required, the wallstand can be additionally fixed in place with the wall bracket. The location of the wall bracket on the wall is determined by positioning the wallstand as desired, then mounting the bracket to the wallstand and marking the hole locations on the wall.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 5.2.15. Wallstand and Table Layout It is possible to manually rotate the tube to −90° / −72° / −18° / +18° / + 72° / +90° / +180° position.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 6. Planning Electrical Connections 6.1. Routing Cables 6.1.1. General Whenever possible, keep high-voltage and power cables away from any other cables. Use separate trough in duct system. Minimize cable length between the line disconnect and the system cabinet power unit to reduce voltage regulation problems and wiring costs.
Page 64
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Without GE Industrial Panel Hospital Power Hospital Power Hospital Power Hospital Power Hospital Power Hospital Power Hospital Power Hospital Power 1φ-230V 1φ-230V 1φ-230V 1φ-230V 1φ-230V 1φ-230V 3φ-480V 3φ-480V...
Page 65
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ With GE Industrial Panel Hospital Power Hospital Power Hospital Power 3φ/480V 3φ/480V 3φ/480V 7.5KVA 7.5KVA 7.5KVA 240V/120V 240V/120V 240V/120V Control Control Control Control 3 winding 3 winding 3 winding...
The Digital PC (part of the Digital subsystem) is the connectivity point between the system and the hospital. For a Broadband connection, it is the purchaser’s responsibility to provide the connection to the Precision RXi system at the Ethernet port on the Digital PC via a Cat 5 Ethernet cable and the hospital Ethernet connection.
Because X-ray equipment produces radiation, you may need to take special precautions or make special site modifications. GE Medical Systems does not make recommendations regarding radiation protection. It is the purchasers responsibility to consult a radiation physicist for advisement on radiation protection in X-ray rooms.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 7.2. Typical Room Layout The following example is referred to a room with small dimensions. room dimensions (in cm) This dimension is referred to the non elevating table version.
Page 69
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ The following example is referred to a room with small dimensions. room dimensions (in cm) This dimension is referred to the elevating table version. Integrated Console Table Positioner Cabinet...
8.3.1. Optional System Main Disconnect An optional system main disconnect has been designed specifically for the Precision RXi system and may be purchased by the customer. E4502KP is available for 480V input and E4502KR is available for 400V input.
Note: Shunt trip circuit breaker required. The main circuit breaker supplied by the customer must be sized in accordance with local regulations and have remote (shunt) trip. 8.4.1.1. System Power Specifications VOLTAGE AND FREQUENCY REQUIREMENTS – US Systems Precision RXi VOLTAGE FREQUENCY POWER INPUT...
Page 72
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ CURRENT REQUIREMENT – US System Precision RXi CURRENT COMPONENT MOMENTARY CONTINUOUS Generator – 65kW 105A 5A(standby current) Generator – 80kW 130A 5A(standby current) Positioner 17.4A Digital Transformer 4.4 A 1.3A...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 8.5. Electrical Grounds 8.5.1. System and Facility Grounds The ground for this system must originate at the system’s power source and be continuous (i.e., transformer or first access point of power into a facility, and be continuous to the system power disconnect in the room.) Ground connection at the power source must be at the grounding point of the “Neutral/Ground”...
_____________________________________________________________________________________________ 8.5.5. Final Checks, Before System Installation Can Begin The customer must provide GE Medical Systems or its representative (Project Manager Installations) evidence that grounds and electrical power meet GE Medical Systems’ specifications. Prior to product installation, a local service or Project Manager Installations, to be determined by GEMS, will do a physical walk-through of the exam suite to ensure the following.
Page 75
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Ground Rod Impedance Test June 2009 Page 75 / 111...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 9. Planning Aids 9.1. Packaging Information 9.1.1. Overhead Tube Suspension Page 76 / 111 June 2009...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Box #1 Dimensions: 460x95x55 cm 181x37x21 inch Item # Description Case no. 1 cover Packing list Hose from the carriage to the rack l=6900 Hose from the x-ray tube to the carriage l=3100...
Page 78
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Item 1 Item 2 Item 1 disassembly details: Power cabinet removed from main palette by removing retaining bolts in base. Control panel removed by hand, no fixation present.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 9.2. Materials and Tools 9.2.1. Tools and Materials Needed But Not Shipped With The Product The following tools and material are needed to install the product: Assorted hardware for termination of electrical connections (solder-less ring lug terminals and butt splices,...
Page 81
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 2.) Step Two – Survey the Route Record all loading capacities, corridor widths, door openings, turning radii, flooring materials, elevator sizes, obstructions and so on for reference. 3.) Step Three – Check the Route Verify equipment can actually be transported via the route determined in step 1.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 9.3.2. Rail Delivery Route Specifics The rails are 440cm/173inch long, and therefore door and hallway layout is critical. See example below for considerations that must be taken. Page 82 / 111...
Page 83
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Pre-Installation Checklist/Worksheet June 2009 Page 83 / 111...
Page 84
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Page 84 / 111 June 2009...
17.5 m (57.4 ft) Wall Bucky to Generator 17.5 m (57.4 ft) Make reference to service manual direction “5142538-100 Precision RXi Drawings” (MIS chart and MIS Maps). The meaningful MIS Chart pages are attached to this manual. June 2009 Page 85 / 111...
Page 86
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Cables colour codes COMPONENT COLOUR Generator cabinet Positioner cabinet Yellow Table Black Integrated User Interface (console) Green Wall Stand Overhead Tube Suspension (OTS) Blue Monitor Suspension/cart Green Modem...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 11. Seismic Calculations 11.1. Overview Seismic requirements are determined and specified by the hospital architect of record and may require approval by the specific state or country agency.
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 11.2.1. Elevating Table 11.2.1.1. Slab on Grade Page 88 / 111 June 2009...
Page 89
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ June 2009 Page 89 / 111...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 11.2.1.2. Upper Floor Page 90 / 111 June 2009...
Page 91
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ June 2009 Page 91 / 111...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 11.2.2. Non-Elevating Table 11.2.2.1. Slab on Grade Page 92 / 111 June 2009...
Page 93
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ June 2009 Page 93 / 111...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 11.2.2.2. Upper Floor Page 94 / 111 June 2009...
Page 95
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ June 2009 Page 95 / 111...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 11.2.3. Generator Cabinet 11.2.3.1. Slab on Grade Page 96 / 111 June 2009...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 11.2.4. Integrated Console 11.2.4.1. Slab on Grade Page 98 / 111 June 2009...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 11.2.5. Table Cabinet 11.2.5.1. Slab on Grade Page 100 / 111 June 2009...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 11.2.6. Monitor Suspension Page 102 / 111 June 2009...
Page 103
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ June 2009 Page 103 / 111...
Page 104
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Page 104 / 111 June 2009...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 11.2.7. Non-tilting Wallstand 11.2.7.1. Slab on Grade June 2009 Page 105 / 111...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 11.2.8. Tilting Wallstand 11.2.8.1. Slab on Grade June 2009 Page 107 / 111...
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ 11.2.9. Overhead Tube Suspension June 2009 Page 109 / 111...
Page 110
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ Page 110 / 111 June 2009...
Page 111
GE M EDICAL YSTEMS RECISION YSTEM NSTALLATION 5123449-100, R IRECTION EVISION _____________________________________________________________________________________________ June 2009 Page 111 / 111...
Page 112
GE M ® ® EDICAL YSTEMS RECISION RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Precision RXi - MIS Chart Page 7...
Page 113
RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Cables between POSITIONER CABINET (Pos. cab.) and POSITIONER (Pos. ) BASE SYSTEM GMM # GE Part # cables description source destination mm Inch C \ mm C \ inch 56298...
Page 114
56297 5129813 0.28 Crimped terminal secondary loudspeaker secondary (507/1SA) (528) Inside POSITIONER CABINET (Pos.Cab.) cables for BASE SYSTEM GMM # GE Part # cables description source destination mm inch C \ mm C \ inch Pos.Cab. - Intercom power supply/amplifier...
Page 115
GE M ® ® EDICAL YSTEMS RECISION RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Pos. - Focal Film Distance Group Ground - 55220 Collimator Ground Pos. - Collimator Ground - 3GND7 0.24 internal 3GND5 X-Ray Housing Tube 55316 Pos.
Page 116
VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Cables between POSITIONER CABINET (Pos. cab.) and DIAGNOSTIC ROOM for BASE SYSTEM GMM # GE Part # cables description source destination mm Inch C \ mm C \ inch Safety for low ceiling Diagnostic Room - Photocell above the Pos.
Page 117
VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Inside POSITIONER CABINET (Pos. cab.) cables for DIGITAL SYSTEM GMM # GE Part # cables description source destination mm inch C \ mm C \ inch Pos. cab. - Infimed Isolator Transformer 068-113 5130678 Power supply I.T./GIM...
Page 118
RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Cables between POSITIONER (Pos.) and GENERATOR CABINET (Gen. cab.) for BASE SYSTEM GMM # GE Part # cables description source destination C \ mm C \ inch mm inch 18875...
Page 119
RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Inside CONSOLE cables for ANALOG SYSTEM (only for SVGA input monitor) GMM # GE Part # cables description source destination mm inch C \ mm C \ inch Video converter/Monitor...
Page 120
RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Cables between CONSOLE and GENERATOR CABINET (Gen. cab.) for BASE SYSTEM GMM # GE Part # cables description source destination mm inch C \ mm C \ inch 736675- Touch Screen 12" Power Gen.
Page 121
VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Cables between CONSOLE and POSITIONER CABINET (Pos. cab.) for DIGITAL SYSTEM GMM # GE Part # cables description source destination mm inch C \ mm C \ inch Console - power supply multiple connector...
Page 122
VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Cables between ROOM DIRECT MONITOR and POSITIONER CABINET (Pos. cab.) for ANALOG SYSTEM GMM # GE Part # cables description source destination mm inch C \ mm C \ inch Monitor Power supply 220...
Page 123
VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Cables between OVERHEAD TUBE SUSPENSION (OTS) and MAIN SUPPLY PANEL for BASE SYSTEM GMM # GE Part # cables description source destination mm inch C \ mm C \ inch 55779...
Page 124
YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Cables between WALLBUCKY and POSITIONER CABINET for BASE SYSTEM (combined with Positioner or OTS with manual collimator) GMM # GE Part # cables description source destination mm inch C \ mm C \ inch...
Page 125
GE M ® ® EDICAL YSTEMS RECISION RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Precision RXi version e - MIS Chart Page 20...
Page 126
RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Cables between POSITIONER CABINET (Pos. cab.) and POSITIONER (Pos. ) BASE SYSTEM GMM # GE Part # cables description source destination mm Inch C \ mm C \ inch 55941...
Page 127
56297 5129813 0.28 Crimped terminal secondary loudspeaker secondary (507/1SA) (528) Inside POSITIONER CABINET (Pos.Cab.) cables for BASE SYSTEM GMM # GE Part # cables description source destination mm inch C \ mm C \ inch Pos.Cab. - Intercom power supply/amplifier...
Page 128
VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Cables between POSITIONER CABINET (Pos. cab.) and DIAGNOSTIC ROOM for BASE SYSTEM GMM # GE Part # cables description source destination mm Inch C \ mm C \ inch Safety for low ceiling Diagnostic Room - Photocell above the Pos.
Page 129
RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Cables between POSITIONER (Pos.) and GENERATOR CABINET (Gen. cab.) for BASE SYSTEM GMM # GE Part # cables description source destination C \ mm C \ inch mm inch 18875...
Page 130
VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Cables between CONSOLE and POSITIONER CABINET (Pos. cab.) for BASE SYSTEM GMM # GE Part # cables description source destination mm inch C \ mm C \ inch Pos. cab. - Auxiliary Transformer - 22TR2-...
Page 132
GE M ® ® EDICAL YSTEMS RECISION RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Fig. 1: Precision RXi system - schematic cables connection Page 27...
Page 133
GE M ® ® EDICAL YSTEMS RECISION RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Fig. 2: Positioner - schematic cables connection Page 28...
Page 134
GE M ® ® EDICAL YSTEMS RECISION RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Fig. 3: Generator/Positioner – schematic cables connection Page 29...
Page 135
GE M ® ® EDICAL YSTEMS RECISION RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Fig. 4: Generator/Positioner – Detailed schematic interconnects Page 30...
Page 136
GE M ® ® EDICAL YSTEMS RECISION RECISION VERSION E YSTEM RAWINGS 5142538 -100, R IRECTION EVISION Fig. 5: Analog system 512 with Totoku monitor– Schematic cables Page 31...