After Service Hand Over; Spares - Bosch WORCESTER Greenstar Danesmoor 18/25 Installation, Commissioning And Servicing Instruction Manual

Floor standing oil-fired condensing boiler conventional flue & room sealed flue
Hide thumbs Also See for WORCESTER Greenstar Danesmoor 18/25:
Table of Contents

Advertisement

1
2
Fig. 95 Oil pump and hose detail
[1]
Oil pump
[2]
Flexible oil hose route. Ensure that the rigid 90° connection at the
pump points to right when the boiler is viewed from the front and
the flexible hose follows the route as show in the figure above.
2. Swing control box back up into operating position and retain in place
by replacing the two securing screws (E) in the bottom locations.
▶ Plug burner lead (F) into control box.
▶ Connect an oil pressure gauge to the oil pump, run the burner and
check the oil pressure is correct for the required boiler output. Check
that the smoke reading is between 0 - 1. If above 1 check the air
setting. If the air setting is correct check that the burner has been
reassembled correctly.
Allow the boiler to warm up then check the combustion settings are
correct as indicated in table 10 on page 44, ensure CO
correct. Adjust the air shutter if necessary see page 44, figure 75 for
details.
When the combustion is correct turn off the boiler, remove the
pressure gauge and refit the blanking plug and plastic cover.
3. Locate the top edge of panel (G) onto the supporting ledge (H) and
secure near the top and at the bottom by gently pushing home the
ball studs into the retaining slots (I). Remember always to apply
pressure at the edges of the panels to avoid damage.
Greenstar Danesmoor Kitchen
ErP+
and Kitchen System
H
6720808218-81.1Wo
Fig. 96 Refitting panels
7.13
▶ Make a note of the date of any water treatment.
▶ Set the controls back to the users requirements.
▶ Complete the service interval record at the back of this manual and a
CD11 or an equivalent form.
levels are
2
▶ If the appliance is unused and exposed to freezing conditions; shut
off all the mains supplies, isolate the boiler and drain the system and
boiler, including the secondary heat exchanger.
7.14
For Worcester Bosch spares refer to the the website at www.worcester-
bosch.co.uk/spares
ErP+ -
6 720 821 686 (2018/04)
2.
F
E
G
3.

After service hand over

Spares

Service and Spares
I
I
6720808218-83.1Wo
51