3-1. FLARING WORK
4) Cut the copper pipe correctly with pipe cutter. (Fig. 7, 2)
2) Completely remove ail burrs from the cut cross section of pipe. (Fig. 3)
Good
No good
+ Put the end of the copper pipe to downward
direction as you
Copper
90;-
pn
ee
x
remove burrs in order to avoid to let burrs drop in the piping.
(Ke pipe
{
3) Remove flare nuts attached to indoor and outdoor units, then put them
<
fA
A
fA
on pipe having completed
burr removal.
(Not possible to put them on
after flaring work.)
Tilted
Uneven
Burred
4) Flaring work
(Fig. 4, 5). Firmly
hold
copper
pipe in the dimension
.
.
shown in the table. Select A mm from the table according to the tool
Fig. 4
Fig. 2
5)
Check.
Flaring tool
* Compare the flared work with Fig. 6.
Burr Copper pipe
~
.
.
:
4
Spare reamer
iS
cE
+ If flare is noted to be defective, cut off the flared section and do
:
"
.
1 )
>
72
Pipe cutter
E s
\
flaring work again.
|
|
Clutch type
Wing nut type
Fig. 3
Fig. 4
A
Inside is shin-
Smooth all
ing without any
around
scratches.
QTY
;
/
—-—- Copper pipe
Bid
\
Die
~ Even length
Fi
'
all around
are nut
Fig. 5
Fig. 6
Pipe diameter
Nut
A [mm (inch)}
Tightening torque
;
Clutch type tool
Clutch type tool
Wing nut type tool
ch
"|
.
.
[mm (inch)]
(mm)
for R410A
for R22
for R22
Nem
kgfecm
ftlb
@6.35
(1/4)
17
1.5 to 2.0
13.7 to 17.7 | 140 to 180
10 to 13
@9.52 (3/8)
22
0100.5
1.0 to 1.5
(0.06 to 0.08)
34.3 to 41.2 | 350 to 420 |
25 to 30
@12.7
(1/2)
26
(0. to 0.02)
(0.04 to 0.06)
201025
49.0 to 56.4 | 500 to 575
36 to 42
@15.88
(5/8)
29
(0.08 to 1.0)
73.5 to 78.4 | 750 to 800
54 to 58
3-2. PIPE CONNECTION
+
Fasten flare nut with a torque wrench as specified in the table.
+
When
fastened too tight, flare nut may
brake after a long period and
cause refrigerant leakage.
Outdoor unit connection
Connect pipes to stop valve pipe joint of the outdoor unit in the same
manner applied for indoor unit.
« For tightening, use a torque wrench or spanner and use the same
tightening torque applied for indoor unit.
3-3. INSULATION AND TAPING
4) Cover piping joints with pipe cover.
2) For outdoor unit side, surely insulate every piping including valves.
3) Using
piping tape (E), apply taping starting from the entry of outdoor
unit.
* Stop the end of piping tape (E) with tape (with adhesive agent at-
tached).
+ When
piping have to be arranged through above ceiling, closet or
where the temperature and humidity are high, wind additional com-
mercially sold insulation to prevent condensation.