Installation; Inspecting The Equipment; Unpacking The Modulareasy; Checking The Accessory Kit - Eaton 9PX 5000i RT3U Netpack Installation And User Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

3.1 Inspecting the equipment

If any equipment has been damaged during shipment, keep the shipping cartons and packing materials
for the carrier or place of purchase and file a claim for shipping damage. If you discover damage after
acceptance, file a claim for concealed damage.
To file a claim for shipping damage or concealed damage:
1. File with the carrier within 15 days of receipt of the equipment;
2. Send a copy of the damage claim within 15 days to your service representative.

3.2 Unpacking the ModularEasy

Unpack the equipment and remove all the packing materials and shipping carton.
Discard or recycle the packaging in a responsible manner, or store it for future use.
Place the cabinet in a protected area that has adequate airflow and is free of humidity, flammable gas,
and corrosion.
Packing materials must be disposed of in compliance with all local regulations concerning waste.
Recycling symbols are printed on the packing materials to facilitate sorting.

3.3 Checking the accessory kit

• Verify that the following additional items are included with the ModularEasy:
9PXMEZ6Ki
9PXMEZ11Ki
614-09354-01_EN

3. Installation

Input/Output UPS cord Set
1
ModularEasy chassis
2
9PX Parallel cable PN: 744-A2675
3
Tower and Wall mounting kit
4
(including 4 ears and screws)
Installation and User manual
5
Cable Gland
1
ModularEasy chassis
2
9PX Parallel cable PN: 744-A2675
3
Tower and Wall mounting kit
4
(including 4 ears and screws)
Installation and User manual
5
Page 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

9px modulareasy9px5kirtn9pxmez6ki9pxmez11ki

Table of Contents