Download Print this page

Zenith DVC2200 Service Manual page 36

Hide thumbs Also See for DVC2200:

Advertisement

DECK MECHANISM DISASSEMBLY
GEAR LOADING
PWB ASSEMBLY LOADING
5. Frame Assembly Up/Down
Note
_
Put the Base Main face down(Bottom Side)
1) Release the Screw(S4)
2) Unlock the Locking Tab(L3) in direction of arrow and
then lift up the Frame Assembly Up/Down to separate
it from the Base Main.
Note
«When reassembling move the Guide Up/Down in direction
of arrow(C) until it is positioned as Fig.(C).
«When
reassembling
insert (A) portion
of the Frame
Assembly
Up/Down
in the (B) portion of the Guide
Up/Down as Fig.(B)
6. Belt Loading(Fig. 4-4)
_
a
Note
_
Put the Base Assembly Main on original position(Top Side)
7. Gear pulley (Fig. 4-4)
GUIDE UP/DOWN
1) Unlock the Locking Tab(L4) in direction of arrow(B) and
then separate the Gear Pulley from the Base Main.
8. Gear Loading (Fig. 4-4)
9. Guide Up/Down (Fig. 4-4)
1) Move the Guide Up/Down in direction of arrow(A) as
Fig.(A)
2) Push the Locking Tab(L5) down and then lift up the
Guide Up/Down to separate it from the Base Main.
_Note
-
=—h—h—m+¥\|——7—Fh—ehmhmeme
When reassembling place the Guide Up/Down as Fig.(C)
and move it in direction arrow(B) until it is locked by the
Locking Tab(L5). And confirm the Guide Up/Down as Fig.(A)
10. PWB Assembly Loading
nee
a
|
3
Put the Base Main face down(Bottom Side)
1) Release 2 Screws($5)
2) Unlock
2 Locking
Tabs(L6)
and
separate
the PWB
Assembly Loading from the Base Main.
11. Base Main(Fig. 4-4)
4-4

Advertisement

loading

This manual is also suitable for:

Dvc2250