Installation Procedure Overview; System Requirements; Hardware Requirements - Nvidia BlueField-2 InfiniBand/VPI DPU User Manual

Table of Contents

Advertisement

Installation Procedure Overview

The installation procedure of DPU involves the following steps:
Step
1
2
3
4
5
7
8
9

System Requirements

Hardware Requirements

Unless otherwise specified, products are designed to work in an environmentally controlled
data center with low levels of gaseous and dust (particulate) contamination.
The operating environment should meet severity level G1 as per ISA 71.04 for gaseous
contamination and ISO 14644-1 class 8 for cleanliness level.
The BlueField-2 DPU is designed and validated for operation in data-center servers and
other large environments that guarantee proper power supply and airflow conditions.
The DPU is not intended for installation on a desktop or a workstation. Moreover, installing
the DPU in any system without proper power and airflow levels can impact the DPU's
functionality and potentially damage it. Failure to meet the environmental requirements
listed in this user manual may void the warranty.
The below table lists the motherboard and power supply requirements per card form factor. 
E-Series: Minimum 75W or greater system power supply through the PCIe x16 interface (Relevant for
HHHL
MBF2M345A-HECOT and MBF2M345A-HESOT)
DPUs
E-Series: Minimum 75W or greater system power supply through the PCIe x16 interface (Relevant for
FHHL
MBF2M516A-EECOT, MBF2M516A-EEEOT, MBF2M516A-EENOT, MBF2M516C-EECOT and MBF2M516C-
DPUs
EESOT)
P-Series: Minimum 75W or greater system power supply through the PCIe x16 interface and an
additional 75W through the supplementary 6-pin ATX power supply connector (Relevant for OPNs:
MBF2H516A-EEEOT
MBF2H516A-EENOT, MBF2H516C-EECOT and MBF2H516C-EESOT).
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Procedure
Check the system's requirements.
Pay attention to the airflow consideration within
the host system
Follow the safety precautions
Unpack the package
Follow the pre-installation checklist
Install the DPU according to the form factor you
have purchased. 
Connect cables or modules to the card
Identify the DPU in the system
Direct Link
Refer to
System Requirements
Refer
to Airflow Requirements
Refer to
Safety Precautions
Refer
to Unpacking
Refer
to Pre-Installation Checklist
Refer
to Cards Installation
Refer to
Cables and Modules Installation
Refer
to Identify the DPU in your System
25

Advertisement

Table of Contents
loading

Table of Contents