Replacement Parts, Service Handbooks And Training Aids; Sequence Of Operation Flow Chart - A.O. Smith BTN 120 THRU 400/A Series Installation And Operaion Manual

A.o. smith commercial gas, gas lined, tank-type water heater models btn 120 thru 400/a series 108 installation operation manual
Table of Contents

Advertisement

REPLACEMENT PARTS, SERVICE HANDBOOKS AND TRAINING AIDS

Replacement parts may be ordered through A.O. Smith dealers, authorized servicers or distributors. Refer to the Yellow Pages for
where to call or contact the A.O. Smith Water Products Company, Product Service Division, 5621 West 115th Street, Alsip, IL 60803,
1-800- 433-2545. When ordering parts be sure to state the quantity, part number and description of the item(s) including the
complete model and serial number as it appears on the product. Refer to the parts list for more information.
Description of this flow chart can be found in the "SEQUENCE OF OPERATION" section found on page 23.
Switch power on
to unit.
Thermostat calls
for heat.
Ignition Control
Board performs
diagnostic check on
components
Ignition Control
Board sends power
to Exhaust Inducer
Exhaust Inducer
engages Prover
Switch
Ignition Control
Board provides
power to Silcon
Nitride Ignitor
Silicon Nitride
Ignitor
warms up for
20 seconds

SEQUENCE OF OPERATION FLOW CHART

Ignition
Control Board
opens Gas
Valve.
Ignition Control
Board shuts off
Silicon Nitride
Ignitor after
3 seconds
Ignition Control
Board waits 3 more
seconds to
monitor Flame
Sensor.
Did Main
Burner Light?
Ignition Control
Board monitors
units until T'Stat
is satisfied.
REPLACEMENT PARTS
NO
YES
30
Ignition Control
Board shuts off Gas
Valve and allows the
Exhaust Inducer to
purge appliance for
20 seconds.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents