Setup
Setup
1. Install supplied ramp onto pallet.
2. Connect Hitch Receiver to line striping or line
removal equipment - Hitch Receiver Kit 25N787;
Manual 3A6720.
3. Install LineDriver Coupler to striper or grinder hitch
ball.
ti11087a
4. Latch Coupler to locked position (M).
NOTE: If Coupler is too tight to latch or is loose after
latching, Coupler needs adjustment. Refer to Coupler
Adjustment, page 15.
M
ti10936a
6
5. Insert safety pin in latch
ti11086a
6. Adjust seat forward/backward with lever below seat.
7. Adjust height of pedals to desired position by
removing/replacing bolts (Y).
8. Loosen two bolts (C) on topside of pedals. Rotate
pedal to desired position. Tighten bolts.
12V Auxiliary Ports
12V auxiliary power ports are provided to power acces-
sories.
12V auxiliary ports must be used to power accessories.
Battery damage can result if other means are used to
power accessories.
ti11085a
NOTICE
3A6623D