Cisco MDS 9396V Installing page 7

Hide thumbs Also See for MDS 9396V:
Table of Contents

Advertisement

Installing the Cisco MDS 9396V Switch
2
2
1
2
16
16
Required Equipment
You need the following equipment for this installation:
• Number 2 Phillips screwdriver
• Tape measure and level (to ensure shelf brackets are level)
Installing the Shelf Bracket Kit into a Four-Post EIA Rack
The following figure shows the installation of the shelf bracket kit into a four-post EIA rack.
Figure 3: Installing the Shelf Bracket Kit into an EIA Rack
To install the shelf brackets in an EIA rack, follow these steps:
Step 1
Position a shelf bracket inside the rack-mounting rails as shown in the above figure. Align the screw holes at the front of
the shelf bracket with the holes in the front rack-mounting rail. Then attach the shelf bracket to the front rack-mounting
rail using a minimum of four 12-24 or 10-24 screws.
The bottom hole of the shelf bracket should align with the bottom hole of a rack unit on the rack-mounting
Note
rail (the hole immediately above the 1/2 in. spacing).
Quantity
Installing the Shelf Bracket Kit into a Four-Post EIA Rack
Part Description
Slider brackets
Slider brackets
Crossbar
10-32 x 3/8-in. Phillips pan-head screws
12-24 x 3/4-in. Phillips screws
10-24 x 3/4-in. Phillips screws
Installing the Cisco MDS 9396V Switch
7

Advertisement

Table of Contents
loading

Table of Contents