Bryant 373LAV Series Installation, Start-Up, And Operating Instructions Manual page 21

Downflow/horizontal gas-fired induced-combustion furnaces
Table of Contents

Advertisement

LOAD CALCULATION
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
AIR FOR COMBUSTION AND VENTILATION
____________
Unconfined Space
____________
Confined Space
VENTING
____________
NFGC (United States)
____________
NSCNGPIC (Canada)
____________
Local Codes
____________
1/4-in. Upward Slope
____________
Joints Secure
____________
See Attached Vent Table Instructions
CHECKLIST—INSTALLATION
____________
____________
____________
____________
____________
____________
____________
____________
—21—
CHECKLIST—START-UP
Gas Input Rate
(Set Within 2 percent of Rating
Plate)
Temperature Rise Adjusted
Thermostat Anticipator Setting Ad-
justed or
Thermostat Cycle Rate (3 cycles per
Hr)
CHECK SAFETY CONTROLS OPERATION
Primary Limit
Pressure Switches
Draft Safeguard Switch
Auxiliary Limit Switch(es)

Advertisement

Table of Contents
loading

Table of Contents