Evm Setup; Jumper Connections; Test Points; Equipment Connection And Operation - Texas Instruments TPS715EVM-074 User Manual

Evaluation module
Table of Contents

Advertisement

www.ti.com

3 EVM Setup

This section describes how to properly connect and setup the TPS715EVM-074, including the jumpers and
connectors on the EVM board. See

3.1 Jumper Connections

3.1.1 J11-14: Output Voltage Select
Connect a shunt across the pins to set the output voltage.

3.2 Test Points

Table 3-2
lists the test points for the TPS715EVM-074.
3.3 Soldering Guidelines
To avoid damaging the LDO, use a hot-air system for any solder rework to modify the EVM for the purpose of
repair or other application reasons.

4 Equipment Connection and Operation

Connect test equipment as described in this section and follow the listed steps to properly take measurements.
1. Configure the onboard shunts to set the main output voltage VOUT
2. Verify that the input voltage power supply is set from 0 V to 24 V
3. Connect the anode of the power supply to J1 (VIN) and the cathode to J2 (GND)
4. Connect the anode of the load for the output to J3 and the cathode to J4
5. Turn on the power supply
6. Vary VIN and the load as necessary for testing purposes
SBVU077 – OCTOBER 2022
Submit Document Feedback
Section 4
for the proper connections of test equipment.
Table 3-1. Selecting VOUT
VOUT
1.8 V
3.3 V
5 V
10 V
Table 3-2. Test Point Functions
TEST
NAME
POINTS
Vout_TP
VOUT
Regulated DC output.
Vin_TP
VIN
Unregulated DC input.
GNDA
GND
GNDB
GND
Device GND.
GNDC
GND
Copyright © 2022 Texas Instruments Incorporated
Table 3-1
lists the VOUT settings.
Jumper to Short
J11
J12
J13
J14
DESCRIPTION
TPS715EVM-074 Evaluation Module
EVM Setup
5

Advertisement

Table of Contents
loading

Table of Contents