Fig. 10 – Horizontal Right Trap Configuration
(Appearance may vary)
Fig. 11 – Horizontal Left Configuration
(Appearance may vary)
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
A230047
Fig. 12 – Example of Field Drain Attachment
To Relocate the Condensate Trap:
• Orient the furnace in the downflow position.
Fig. 9
shows the condensate trap and tubing before and after
relocation. Refer to
• Refer to Condensate Drain section for information how to install the
condensate drain.
Condensate Trap - Horizontal Orientation.
When the furnace is installed in the horizontal right position, the
A230048
condensate trap will be initially located at the bottom of the collector
box, as received from the factory. See the top image in
furnace is installed in the horizontal left position, the condensate trap
will be initially located at the top of the collector box, as received from
the factory. See the top image in
repositioned on the collector box for proper condensate drainage. See the
bottom images in
Fig. 10
A field-supplied, accessory Horizontal Installation Kit (trap grommet) is
required for all direct-vent horizontal installations (only). The kit
contains a rubber casing grommet designed to seal between the furnace
casing and the condensate trap. See
To Relocate the Condensate Trap:
• Remove the knockout or plug in the casing for the condensate trap.
• Install the grommet in the casing when required for direct-vent
horizontal applications.
A230049
• Orient the furnace in the desired position.
• Allow for 2 in. (51 mm) of clearance underneath the furnace for the
condensate trap and drain line.
Fig. 10
shows the condensate trap and tubing before and after
relocation in the horizontal right position.
Fig. 11
shows the condensate trap and tubing before and after
relocation in the horizontal left position.
• Refer to the appropriate figure to begin the trap conversion.
• Refer to Condensate Drain section for information how to install the
condensate drain.
12
-
-
- -
-
-
- -
-
Fig. 9
to begin the trap conversion.
Fig.
11. In both cases the trap must be
and
Fig.
11.
Fig.
18.
-
-
-
A170135
Fig.
10. When the

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents