LG B B B B B Gas–fired boiler Control Supplement Control Supplement Control Supplement Control Supplement Control Supplement LGB-4 LGB-5 & – Propane gas Series 2 Universal Control System Contents Installation ....... 2 Conversion ( ) ... 2 Natural/Propane Gas piping ......3 Wiring .......
Existing installation Conversion from natural gas to propane gas This conversion is to be installed by a Weil-McLain distributor or other qualified agency in accordance with the manufacturer's instructions and all codes and requirements of the authority having jurisdiction. Failure to follow instructions could result in serious injury or property damage.
-4 & 5 5 5 5 5 LGB-4 • • • Control Supplement Propane Wiring Part Number 550-141-919/0304...
Page 5
-4 & 5 5 5 5 5 LGB-4 • • • Control Supplement Propane For your safety, turn off power supply before making Figure 2 Wiring diagram electrical connections to avoid possible electrical shock hazard. Label all wires prior to disconnection when servicing controls.
LGB-4 -4 & 5 5 5 5 5 • • • Control Supplement Propane Operating instructions A. This boiler is equipped with a pilot which must be lighted by hand. When lighting the pilot, follow these instructions exactly. The gas supply to this pilot is controlled by the Pilot Switch Box.
LGB-4 -4 & 5 5 5 5 5 • • • Control Supplement Propane Verification testing Before starting boiler for the first time and at least annually (during annual inspection and start-up), follow the procedures below to verify boiler controls are operating correctly and that automatic gas valve properly shuts off gas flow.
LGB-4 -4 & 5 5 5 5 5 • • • Control Supplement Propane Parts list Figure 3 Control and gas components Weil-McLain 500 Blaine Street Michigan City, IN 46360-2388 http://www.weil-mclain.com Part Number 550-141-919/0304...