Setting Up The Common Vent System; Common Vent Termination Clearances - Navien NPE-180A2 Installation Manual

Npe condensing water heaters
Hide thumbs Also See for NPE-180A2:
Table of Contents

Advertisement

6.6 Setting up the Common Vent
System
WARNING
Electric Shock Hazard
To prevent serious injury or death:
ALWAYS disconnect power before servicing.
NEVER turn power on until the electrical
wiring installation is complete.
NEVER remove front cover unless power to
unit is turned off or disconnected.
Setting up for a Cascade System
1. Press and hold the Menu button (
Back button (
) simultaneously for 3 seconds
on the front panel to access the Service/Installer
menu.
2. Select 2. Cascade Status and Set > 5. Cascade
Vent Setting by pressing the OK button (
and set up the common vent system for a
cascade system.
Function Menu
Cascade
2. Cascade Status and Set
Unit Vent
2.5. Cascade Vent setting
86
Installing a Common Vent System
6.7 Common Vent Termination
Clearances
6.7.1 Direct Vent Application – Vertical
Installation
(30.48 cm)
) and the
Note
)
6.7.2 Venting Intake and Exhaust to
Description
Different Locations
Common Vent
Individual Vent
Intake
12"
min.
End
Cap
Unit 1 Unit 2
For more information about the
installation of the flue, refer to "3.6.6
Terminating the Vent" on page 54.
End
Cap
Unit 1 Unit 2
Unit 12
36" (91cm) min.
Exhaust
12"
(30.48 cm)
min.
Unit 12
Drain
Exhaust
Intake
Drain

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Npe-210a2Npe-240a2Npe-180s2Npe-210s2Npe-240s2Npe-150s2

Table of Contents