Physical Installation; Ec Series Headers - Martin EC-10 Installation And Safety Manual

Table of Contents

Advertisement

Physical installation

WARNING! Read "Safety Information" on page 4 before installing the EC Series.
WARNING! The safety and suitability of lifting equipment, installation location, anchoring method,
mounting hardware, suspension structures and electrical installation is the responsibility of the
installer. All local safety regulations and legal requirements must be observed when installing and
connecting the EC Series panels.
WARNING! Installation must be carried out by qualified professionals only. Contact your Martin
supplier for assistance if you have any questions about how to install this product safely.
WARNING! A maximum of sixteen EC Series panels may be suspended from one EC Series Header.
EC Series video panels are intended for suspension in vertical columns a maximum of sixteen panels high.
An unlimited number of correctly supported columns of panels may be installed horizontally alongside each
other. There is provision for both flat and curved video wall configurations.
It is possible to mix and interconnect EC-10 and EC-20 panels in an installation. The P3 System Controller
will recognize the different panel types.
The illustrations in this chapter show EC-20 panels, but procedures are identical for EC-10 panels.

EC Series Headers

EC Series video panels must be suspended in columns from EC Series Headers. Each Header has inputs
for power and P3 video data, and relays power and data to the panels suspended below it via integral
connectors.
A - Header power input cable
Used to supply power to the Header and attached EC
Series panels. Hard-wired via an IP67-rated cable
gland.
WARNING! A maximum of sixteen EC Series panels
in total may be connected to power in one chain
that draws power through one EC Series Header.
B - Eyebolt (supplied)
Can be used to support a Header if two or more
Headers are connected horizontally using Header
Connection Brackets. This eyebolt has a nominal
weight capacity of 800 kg.
C - Rigging clamps (not supplied)
Can be used to attach a Header to a truss E or similar
supporting structure.
D - Header P3 data input cable
Used for bi-directional P3 system communication.
Accepts an Amphenol IP67-rated Ethernet cable
connector (or a standard Ethernet connector for indoor
use only).
E - Truss (not supplied)
Figure 2: EC Series Header
Physical installation
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec seriesEc-20

Table of Contents