Step-By-Step Installation - Samsung RF65A967FB1/EU User Manual

Table of Contents

Advertisement

Step-by-step installation

STEP 1 Select a site
The site must:
• Have a solid level surface without carpeting or flooring that may obstruct ventilation
• Be out of direct sunlight
• Have adequate room for opening and closing the door
• Be away from any heat source
• Provide room for maintenance and servicing
• Have a temperature range between 10 °C and 43 °C
English 31

Advertisement

Table of Contents
loading

Table of Contents