10-Installation

10.1 Preparation
Take the appliance out of the packaging.
keep them out of childrens reach. While opening the package, water drops may be
seen on plastic bag and porthole. This normal phenomenon results from water tests
in the factory.
Note: Packaging disposal
Keep all packaging materials out of children´s reach and dispose them in an
environmentally friendly manner.
10.2 OPTIONAL: Install noise reduction pads
1.When opening the shrink package, you will find four
noise reduction pads. These are used for reducing
noise (Fig. 10-1).
. 2
L
y a
h t
e
w
a
h s
n i
g
pointing upwards, bottom side towards operator.
3. Take out the noise reduction pads and remove the
double-sided adhesive protective film; paste around
the bottom ; the noise reduction pads under the
washing machine cabinet as shown in Figure 3 (two
longer pads in position 1 and 3, two shorter pads in
position 2 and 4). Finally set the machine upright again.
10.3 Dismantle the transportation bolts
The transport protection on the rear side is designed
for clamping anti-vibration components inside the ap-
pliance during transportation to prevent inner damage.
All elements (T1-T4, Fig 10-2) must be removed before
use.
1.Remove all 4 bolts (T1 - T4) (Fig. 10-3).
General information and tips:
Keep the transportation bolts in a safe place for later
use. If the machine is to be moved to another location,
replace transportation bolts contrariwise to prevent
damage.
2. Fill the transportation bolt holes with blanking plugs
(Fig. 10-4).
m
a
h c
n i
e
d
o
w
n
o t
s t i
1.
s
d i
e
p ,
o
t r
hole
NZ AU
2.
10-1
3.
10-2
T3
T4
T2
T1
10-3
10-4
25