Positioning and connecting
en
Removing the support struts
Unscrew and remove all screws in
1.
the vertical transport struts.
Remove the transport struts.
2.
Undo and remove the screws on the
3.
horizontal transport strut.
Remove the transport strut.
4.
16
Hose and cable lengths
Connection on left side
( ~ 105 cm
0 ~ 100 cm
8 ~ 150 cm
@ 0 cm ~ 100 cm
or
Connection on right side
( ~ 75 cm
0 ~ 145 cm
8 ~ 190 cm
@ 0 cm ~ 100 cm
If the supply hose is too short for
Note:
your connection, you can order an
extension from the after-sales service.