Component Test Procedure - LG MS2349H Service Manual

Hide thumbs Also See for MS2349H:
Table of Contents

Advertisement

COMPONENT TEST PROCEDURE

CAUTIONS
1. DISCONNECT THE POWER SUPPLY CORD FROM THE OUTLET WHENEVER REMOVING THE
OUTER CASE FROM THE UNIT. PROCEED WITH THE TEST ONLY AFTER DISCHARGING THE HIGH
VOLTAGE CAPACITOR AND REMOVING THE WIRE LEADS FROM THE PRIMARY WINDING OF THE
HIGH VOLTAGE TRANSFORMER. (SEE PAGE 2-1)
2. ALL OPERATIONAL CHECKS WITH MICROWAVE ENERGY MUST BE DONE WITH A LOAD (1 LITER
OF WATER IN CONTAINER) IN THE OVEN.
COMPONENTS
HIGH VOLTAGE
TRANSFORMER
(Wire leads removed)
MAGNETRON
(Wire leads removed)
Copyright © 2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
TEST PROCEDURE
PRIMARY
TERMINAL
1. Measure the resistance.
(Ohm-meter scale: Rx1)
• Primary winding
• Secondary winding
• Filament winding
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
• Primary winding to ground
• Filament winding to ground
1. Measure the resistance.
(Ohm-meter scale: Rx1)
• Between Filament terminal
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
• Filament to chassis
5-8
FILAMENT
WINDING
TERMINAL
SECONDARY
WINDING
Approx.: 1~3 Ω
Approx.: 100~160 Ω
Less than: 0.4 Ω
Normal: ∞
Normal: ∞
Normal: Less than 1 Ω
Normal: ∞
RESULTS
LGE Internal Use Only

Advertisement

Table of Contents
loading

Table of Contents