Selecting A Location And Connecting Input Power - Miller Millermatic 300 Owner's Manual

Table of Contents

Advertisement

2-12. Selecting a Location and Connecting Input Power

18 in (457 mm)
for airflow
Have only qualified persons make this installation.
1
Rating Label
Check input voltage available at site.
Remove wrapper.
2
Jumper Link Label
OM-1321 Page 14
Tools Needed:
200 VOLTS
2
3/8 in
3/8 in
GND/PE
1
Connect First
Size and ratings must comply with applicable
codes (see Section 2-11). Install conductors in
conduit or equivalent into a deenergized line
disconnect device.
Do not overtighten
jumper link nuts.
230 VOLTS
3
Jumper Links
Move jumper links to match input voltage.
Reinstall wrapper.
Y Special installation may be required where gasoline or
volatile liquids are present – see NEC Article 511 or
CEC Section 20.
GND/PE
L1
L2
L3
3
460 VOLTS
Ref.
S-072 135-B
Ref. ST-801 768-B

Advertisement

Table of Contents
loading

Table of Contents