Potterton Promax SL Series Installation & Service Instructions Manual page 4

Condensing central heating boiler
Hide thumbs Also See for Promax SL Series:
Table of Contents

Advertisement

IMPORTANT ­ Installation, Commissioning, Service & Repair
This appliance must be installed in accordance with the manufacturer's instructions and the regulations in force. Read the instructions
fully before installing or using the appliance.
In GB, this must be carried out by a competent person as stated in the Gas Safety (Installation & Use) Regulations.
Definition of competence: A person who works for a Gas Safe registered company and holding current certificates in the relevant ACS
modules, is deemed competent.
In IE, this must be carried out by a competent person as stated in I.S. 813 "Domestic Gas Installations".
NOTE: The addition of anything that may interfere with the normal operation of the appliance without express written permission from the
manufacturer or his agent could invalidate the appliance warranty. In GB this could also infringe the Gas Safety (Installation and Use)
Regulations.
Warning ­ Check the information on the data plate is compatible with local supply conditions.
All Gas Safe registered engineers carry an ID card with their licence number and a photograph. You can check your engineer is
registered by telephoning 0800 408 5500 or online at www.gassaferegister.co.uk
The boiler meets the requirements of Statutory Instrument " The Boiler (Efficiency) Regulations 1993 No 3083" and is deemed to meet
the requirements of Directive 92/42/EEC on the energy efficiency requirements for new hot water boilers fired with liquid or gaseous
fuels:­
Type test for purpose of Regulation 5 certified by:
Notified Body 0087.
 
Product/Production certified by:
Notified Body 0086.
For GB/IE only.
 
This company declares that no substances harmful to health are contained in the appliance or used during appliance
manufacture.
The appliance is suitable only for installation in GB and IE and should be installed in accordance with the rules in force, and
only used in a suitably ventilated location.
In GB, the installation must be carried out by a Gas Safe Registered Installer. It must be carried out in accordance with the relevant
requirements of the:
Gas Safety (Installation & Use) Regulations.
The appropriate Building Regulations either The Building Regulations, The Building Regulations (Scotland), Building Regulations
(Northern Ireland).
The Water Fittings Regulations or Water Byelaws in Scotland.
The Current I.E.E. Wiring Regulations.
Where no specific instructions are given, reference should be made to the relevant British Standard Code of Practice.
In IE, the installation must be carried out by a competent Person and installed in accordance with the current edition of I.S. 813
'Domestic Gas Installations', the current Building Regulations and reference should be made to the current ETCI rules for electrical
installation.
All systems must be thoroughly flushed and treated with inhibitor (see section 6.2).
Codes of Practice, most recent version should be used
In GB the following Codes of Practice apply:
Standard
Scope
BS 6891
Gas Installation.
BS 5546
Installation of hot water supplies for domestic purposes.
BS EN 12828
Heating systems in buildings.
BS EN 12831
Heating systems in buildings ­ calculations of load
BS EN 14336
Installation &commissioning of water based heating systems.
BS 6798
Installation of gas fired hot water boilers.
BS 5440 Part 1 Flues.
BS 5440 Part 2 Ventilation.
BS 7074
Expansion vessels and ancillary equipment for sealed water systems.
BS 7593
Treatment of water in domestic hot water central heating systems.
In IE the following Codes of Practice apply:

Advertisement

Table of Contents
loading

Table of Contents