Maintenance
9.3 Inspection and maintenance
9.3.5
Maintenance intervals
Please note the following in order to identify faults at an early stage, rectify them and avoid
follow-on damage:
• Maintain the machine regularly and carefully.
• Inspect the machine.
• Motors must be allocated a revision/inspection number after inspection.
Measures and intervals
Operating situations and characteristics can vary widely. For this reason, only general
maintenance intervals are specified here. Maintenance intervals should therefore be scheduled
to suit the local conditions, such as dirt, number starting operations, load, etc.
Measures
Initial inspection
Regreasing
Clean
Main inspection
Drain condensate
9.3.6
Servicing and maintaining the anti-condensation heating
The anti-condensation heating is maintenance-free. If it is defective, then contact
the Service Center (Page 12).
114
NOTICE
Motor failure
Material damage can occur if the machine develops faults or is overloaded.
• Immediately inspect the machine if faults occur.
• An immediate inspection is necessary if the three-phase motor is excessively stressed,
either electrically or mechanically (e.g. overload or short-circuit).
Operating period interval
After 500 operating hours
See the lubricant plate
Depending on the degree of pollution
Approximately every 16000 operating
hours
Depending on the climatic conditions
Intervals
After 1/2 year at the latest
After 2 years at the latest
1MB5 shaft height 400/450
Operating Instructions, 04/2023, A5E52802354A