Startup; Maintenance - Siemens SIMEAS-T Operating Instructions Manual

Transducer with auxiliary power
Table of Contents

Advertisement

2.11 Startup

Make sure that the operating data match the data given on the rating plate.
Do not modify any transducer settings. The transducer is operational after a 15
minute warm-up period and will keep within the error tolerances.
• Measuring the output current and the load voltage:
Before connecting an amperemeter to the output side of the transducer,
the auxiliary power must be disconnected, since the voltage at terminals 31
und 32 can reach a maximum of 30 V DC during interruption of the output
current I
.
A
• Measuring the output current (output signal I
Disconnect the wire from terminal 31(+) or 32(-) and connect the amperemeter
in series.
• Measuring the load voltage (output signal I
Connect the voltmeter to terminals 31(+) and 32(-)

2.12 Maintenance

The transducer is maintenance-free. The output signal can be tested in a
laboratory 6 months after startup and thereafter every two years (section on
"Calibration and testing"). For this, the appliance needs to be opened.
SIMEAS-T - Transducer with Auxiliary Power
):
A
), or the output signal U
A
:
A
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

7kg6131

Table of Contents