NANO NBM-120 User Manual

Nbm - breathing air module

Advertisement

Quick Links

NBM - BREATHING AIR MODULE
SERIES 2 & 3 BREATHING AIR USER GUIDE

Advertisement

Table of Contents
loading

Summary of Contents for NANO NBM-120

  • Page 1 NBM - BREATHING AIR MODULE SERIES 2 & 3 BREATHING AIR USER GUIDE...
  • Page 2: Table Of Contents

    Contents Page General information 1.1. Document introduction 1.2. Support and Manufacturers details 1.3. Warranty Guidelines 1.4. Packaging General safety 2.1. Intended Use 2.2. Personnel 2.3. Safe Handling Technical Description Technical Specification 4.1 Product Specification 4.2 Breathing Air Standards Maximum Flow Rates CO Alarm...
  • Page 3: General Information

    General Information This manual is copyrighted, all rights reserved. It may not, in whole or in part, be copied, photocopied, reproduced, translated, or reduced to any electronic medium or machine readable form without prior consent in writing from nano-purification solutions ltd. It may not be distributed through the internet or computer bulletin board systems without prior consent from nano-purification solutions ltd. © 2017 nano-purification solutions ltd. Product: Series 2 & 3 Breathing Air Module Document number: 17-110-1494 Issue: 002 Document Introduction This manual provides factory prescribed installation and maintenance procedures for a nano-purification solutions (n-psi) breathing air module (NBM). The procedures illustrated in this document are only to be performed by competent personnel. For further information regarding the procedures outlined in this document contact nano-purification solutions before proceeding. Read this document carefully before attempting to install or operate the Purifier. This document should be permanently available at the Purifier installation site and be kept in an easily accessible place alongside the Purifier. Manufacturer’s details and support nano-purification solutions ltd nano-purification solutions inc. Dukesway 5509 David Cox Road...
  • Page 4: Warranty Guidelines

    Warranty Guidelines All products come with a 2 year manufacturer’s warranty from the date of purchase, under the condition that it is installed and maintained in accordance with the manufacturer’s guidelines. Only genuine service parts should be used and no modifications made. For further information please contact nano-purification solutions. Packaging All products are securely packaged in a specifically designed wooden packing box. The purifier will be held in a horizontal position by wooden struts; using straps to secure the product to the box base. The box top cover can be removed by removing all of the fixing screws and lifting it off in one piece. Damage to Packaging • Check immediately to establish whether damage has occurred to the external packaging and if the damage extends to the product inside.
  • Page 5: General Safety

    General safety For your own safety, when carrying out work on this product, all relevant national safety regulations must be complied with relating to pressurized and breathing air systems. It is essential that a risk assessment is carried out prior to installation and use. See section 8.4 for guidance. 2.1.
  • Page 6: Technical Description

    Technical Description The nano-purification solutions Breathing Air Module (NBM) is designed for use in existing systems where a properly maintained desiccant dryer and appropriate filtration is already installed. For a complete purifier package, please refer to the B1 Series Compressed Breathing Air Purifiers, or contact nano-purification solutions before proceeding. When used in the appropriate system, the NBM Purifier Modules are designed to provide a continuous supply range of breathable air to meet the most exacting standards world-wide. The design incorporates several stages of purification in one simple to service cartridge, reducing the cost of ownership and simplifying maintenance. Atmospheric air contains a number of contaminants which must be removed to ensure the provision of high purity breathable air. Contaminants present include dirt, water, oil, hydrocarbon vapors, bacteria and toxic gases such as CO, NO and SO The nano breathing air module is a static adsorber, which employs two purification stages to ensure breathable compressed air is produced from a typical compressed air supply. The purifier must be preceded by inlet filtration which removes dirt, bulk water and oil aerosols and a heatless desiccant air dryer which delivers air to -40 F pressure dewpoint. For advice on the required inlet air quality of the purifier please refer to the specification on page 7 or contact Nano Purification Solutions. The purifier removes HydroCarbon Vapors and reduces CO to specified levels through adsorbent and catalyst stages contained within removable cartridges. The cartridges are non-regenerative and should be replaced periodically inline with the product service schedule on page 17. Page 6 17-110-1494...
  • Page 7: Technical Specification

    4. Technical Specification 4.1 Product Specification EUROPEAN & NORTH CANADIAN SPECIFICATION AMERICAN SPECIFICATION Required Inlet Purity ISO 8573-1 : 2010 Class 1.2.1 ISO 8573-1 : 2010 Class 1.2.1 Minimum working pressure 80 psig (5.5 barg) 80 psig (5.5 barg) Maximum working pres- 232 psig (16 barg) 217.5 psig (15 barg) Minimum inlet temperature 34.7°F (1.5°C) 34.7°F (1.5°C) Maximum inlet temperature 86°F (30°C) 86°F (30°C) Breathing Air Standards Impurity European Pharma CSA Z180.1 <500ppm <500ppm <5ppm...
  • Page 8: Maximum Flow Rates

    *Where excessive levels of CO and CO have been identified as the norm, breathing air purifiers should not be used and alternative strategies should be derived from a risk assessment. When challenged with 750ppm When challenged with 65ppm The breathing air module should be preceded by high efficiency filtration and a heatless desiccant dryer regardless of whether an oil or oil free compressor is used. Inlet air should be filtered and dried such that it complies with ISO 8573-1: 2010 quality class 1.2.1. Maximum Flow Rates Maximum Flow Rate Model NL/m scfm NBM - 120 3428.4 NBM - 240 6856.8 NBM - 480 13713.6 NBM - 720 20570.4...
  • Page 9: Product Dimensions

    Product Dimensions Dimension Weight Connection Model (BSP or NPT) (lbs) (ins) (ins) (ins) (ins) (ins) 1” 622.5 246.4 NBM-120 (24.5) (17.3) (9.7) (6.3) (15.4) (84) (Inlet & outlet) 1” 805.5 246.4 NBM-240 (31.6) (17.3) (9.7) (6.3) (15.4) (100) (Inlet & outlet) 17-110-1494 Page 9...
  • Page 10 Dimension Weight Connection Model (BSP or NPT) (lbs) (ins) (ins) (ins) (ins) (ins) 2” 574.2 NBM-480 (34.3) (15.7) (22.6) (15) (14.2) (227) (Inlet & outlet) 2” 742.2 NBM-720 (34.3) (15.7) (31.7) (21.7) (14.2) (313) (Inlet & outlet) ” 910.2 NBM-960 (34.3) (15.7) (35.8) (28.3) (14.2)
  • Page 11: Equipment Overview

    Equipment Overview TO CO MONITOR TO CO MONITOR INSTRUMENT TAPPING POINT DETAIL ‘B’ DETAIL ‘A’ Air Inlet Air Outlet 1/4” - 3/16” Hose Adaptor (Supplied) NBM Column (BSP or NPT) NOTE:- Item 4 not fitted but supplied with product. 17-110-1494 Page 11...
  • Page 12: System Layout

    7. System Layout 7.1. Typical installation NBM-120 - 240 INLET AIR QUALITY: (ACCORDING TO ISO 8573.1 QUALITY) BREATHING AIR INLET FILTRATION HEATLESS DESICANT MODULE •DIRT <0.5 microns CLASS 2 AIR DRYER •HUMIDITY -40ᵒf CLASS 2 •CO 50 ppm MAXIMUM •CO < 500 ppm OUTLET AIR QUALITY: NO EXTERNAL DUST FILTER 7.2. Typical installation NBM-480 -960 REQUIRED DUST FILTER TO ISO 5873.1...
  • Page 13: Site Location

    7.3. Site Location When selecting an installation site for the Purifier, ensure the following conditions are met: • Installation site should be located indoors on a flat surface protected from the weather and other harmful conditions. • The ambient temperature must not drop below 34.7°F (+1.5°C) or exceed 86°F (30°C). • The installation site should be level and able to support the weight of the product. • Ensure sufficient space around the product, to allow access for operation and maintenance. 7.4. Risk Assessment Prior to the installation a thorough risk assessment of the entire installation should be conducted by a competent person. Points listed below should be considered but should not be considered an exhaustive: • Compressor type • Pre-Filtration and Dryer suitability • Condition of compressor/oil used if applicable • Temperature and humidity • Potential source of excessive contaminants e.g. toxic gases • Use of a dedicated breathing air line if possible • Purification equipment • Alarm options • Compliance to relevant regulations for pressured systems •...
  • Page 14: Purifier Operation

    Module Operation 8.1. Purifier Start-up • Connect all pipe work, in line with the system layout on page 12. • Ensure the inlet operating pressure parameters are correct (refer to specification on page 7). • Ensure the inlet air temperature is correct (refer to specification on page 7). • Slowly open the inlet valve until fully open and allow purifier to pressurize. • Open the outlet valve to deliver breathable air. Page 14 17-110-1494...
  • Page 15: Maintenance

    Maintenance 9.1. Cleaning Clean the equipment with a damp cloth and if required a mild detergent may be used, however do not use abrasives or solvents as they may cause damage. 9.2. Daily Checks Visual and functional checks of the Purifier should be carried out daily: • Check the Purifier for any external damage. Assess and eliminate any defects found. • Remove any loose dust or dirt from the Purifier; clean all surfaces that appear to have attracted unwanted contaminants. • Check the operation and readings on the CO monitor. Operate in accordance with suppliers instructions. 9.3. Sampling A sample of compressed breathing air produced and delivered by the compressed breathing air system must be collected and analyzed every 6 months (or as specified by the authority having jurisdiction)
  • Page 16: Servicing

    10. Servicing Maintenance operations should only be carried out by authorized, competent and suitably trained personnel. 10.1. Serving Guidelines • Maintenance operations only to be conducted when the system has been shut down, fully depressurized and isolated completely from the compressed air. • Ensure the system is in a safe condition for maintenance to be carried out on. • Dismantle and assemble with care, paying particular attention to the areas that become pressurized. • All gaskets removed during maintenance operations must be replaced with new gaskets. • Only certified n-psi approved replacement parts to be used. • Always check all connections / sealing faces for cleanliness and secure seating prior to assembly. • Ensure all components are refitted to the product before operation. • Ensure the Purifier is left operating in a safe working condition after completion of maintenance.
  • Page 17: Servicing Intervals

    10.1 Service Intervals The following table details the recommended service intervals for this product. The purifier should be serviced in accordance with the schedule outlined below. Failure to service the product as indicated and/or without genuine parts may damage the product, cause serious physical harm and will invalidate the manufacturer’s warranty. Please refer to the product service guide for instruction regarding carrying out a service. • Service Frequency - 8,000 hours (or every 1 year) service. • Replace all external filter elements (pre and post-filters) (Please contact an n-psi representative for filter servicing information). •...
  • Page 18: Troubleshooting

    13. Troubleshooting Problem Problem Caused Solutions Insufficient inlet pressure Inlet pressure min 80 psig (5.5 barg). If not adjust inlet pressure settings. Moist or contaminated bed Eliminate the cause of contamination. Replace purification cartridges – do not re-use. Poor performance Too high air consumption Ensure the performance of the purifier matches the required system air consumption. Excessive inlet air temperature Check against technical specification. Outlet flow stops Check inlet air supply. Failure of purifier to cycle Reference to known Fault: Opening the inlet valve too quickly Valve should be opened slowly allowing the pressure to build up gradually.
  • Page 19: Commissioning Report

    User Guide Posted on Site? Check for Damage Maintenance Items on Site? Has this unit been installed according to Comments: manufacturers recommendations, passed a third party air quality test, and deemed suitable for operating by the installer? YES or NO. Start-up Check List Yes/No Has the product been received in good condition? Has the user received and reviewed the User Guide? Has the user carried out the recommended Risk Assesment? Is the product installed and operational? Are there spare parts on site? Has a daily check procedure been established? Does the user require any assistance from nano-purification solutions? I certify all of the above Yes/No Engineer: Date: information to be true? Note: For an electronic version of this commissioning report, please download from our website at www.n-psi.com in the “downloads – Breathing Air" section. 17-110-1494 Page 19...
  • Page 20: Quality Statement

    Proper preventative maintenance of the system should be documented and maintained based on recommended maintenance of the manufacturer. Grade-D (USA) or CSA Z180.1 testing (Canada) should be carried out and documented. These tests should analyze at a minimum: Carbon Monoxide, Oxygen, Carbon Dioxide, Water content, Hydrocarbon content and total particulate level. The actual allowable levels are clearly documented in the Technical Specification section. When in doubt, please consult factory. nano-purification solutions ltd. Dukesway, Team Valley Trading Estate, Gateshead, NE11 0PZ United Kingdom Telephone: +44 (0) 191 497 7700 Internet: www.n-psi.co.uk E-mail: enquiries@n-psi.co.uk nano-purification solutions inc. 5509 David Cox Road...
  • Page 21: Notes

    Notes 17-110-1494 Page 21...
  • Page 22 Notes Page 22 17-110-1494...
  • Page 23 Notes 17-110-1494 Page 23...
  • Page 24 Dukesway, Team Valley Trading Estate, Gateshead, NE11 0PZ United Kingdom Telephone: +44 (0) 191 497 7700 Internet: www.n-psi.co.uk E-mail: enquiries@n-psi.co.uk nano-purification solutions inc. 5509 David Cox Road Charlotte NC 28269 Telephone: +1 (704) 897-2182 Fax: +1 (704) 897-2183 Internet:www.n-psi.com...

This manual is also suitable for:

Nbm-240Nbm-480Nbm-720Nbm-960

Table of Contents