3 Assembly procedure, necessary equipments, and schedule
Day
Hour
Assembly unit
Assembly procedure No.
Number of workers
Suspension gas
pouring tool
Remarks
4 Necessary tools and equipments
(1) Necessary tools
No.
Tool name
1
Ring wrench
2
Impact wrench
3
Socket
4
Suspension gas pouring tool
(2) Necessary equipments
No.
Equipment name
1
Stepladder (Work stand)
2
1
2
(1) Positioning bare machine
(2) Installation of rear monitor
(3) Installation of right and left mudguards
2
Adjusting
suspension gas
Meeting before work
Unloading
Starting assembly
Specifications
19 mm
GTP-800P/GTP-60VP or equivalent
19 mm
(7926-10-1000)
Specifications
4 steps (About 1.5 m)
1st day
3
4
5
(4) Installing engine hood mirror
(5) Adjusting N2 gas of front and
rear suspensions
No.0100 - 0500
Completion of assembly
Q'ty
Each 1 For assembling parts
Each 1 For assembling parts
Each 1 For assembling parts
1
Q'ty
1
6
7
Remarks
For adjusting suspension gas
Remarks
For work
8