High Voltage Check

1. Select an active TV channel and confirm that
horizontal is in sync.
2. Adjust Brightness and Picture using Picture Icon
menu so video just disappears.

Purity and Convergence Procedure

Adjustment is necessary only if the CRT or the
deflection yoke is replaced or if the setting was
disturbed. The complete procedure consists of:
1. Vertical Raster Shift Adjustment.
2. Initial static convergence.
3. Setting the purity.
4. Final static convergence.

When the CRT or the Yoke is Replaced

Place the yoke on the CRT neck (do not tighten
the clamp).
Place the vertical raster shift tabs at 3 o'clock (90
the purity and convergence tabs)
Figure 10.
Positioning of Purity/Convergence
Assembly (4 Pairs of Rings)
R&B&G Convergence Rings
R&B Convergence Rings
Vertical Raster
Shift Rings
Purity Rings
Figure 11.
Positioning of Purity/Convergence
Assembly (4 Pairs of Rings)
Turn the Receiver ON. Operate the Receiver for 60
minutes using the first Purity Check field (white screen)
to stabilize the CRT.
Fully degauss the Receiver by using an external
degaussing coil.
Slide the deflection yoke back and forth on the neck of
the CRT until it produces a near white, uniform raster.
3. Confirm B+ 140.0V is within limit.
4. Using a high voltage meter confirm that the High
Vertical Raster Shift Adjustment
Apply a green pattern with a horizontal line, adjust the
Deflection Yoke so that has no tilt, then secure it.
Adjust center line of the pattern with the mechanical
center of the CRT, this center is determined by two
marks at the side edges of the screen. To adjust the
line, once the vertical raster shift tabs are place at 3
o'clock to reduce its magnetic field effect (see Fig. 10
and Fig. 11) open the tabs the same angle from the
center, until the center line of the pattern becomes a
straight line, centered with the marks of the CRT. (see
Fig. 12)
o
from

Initial Center Static Convergence

o
90
Connect a dot/cross hatch generator to the Receiver
and tune in a signal. Observe misconvergence at
center of the screen only.
Adjust the R&B pole magnets; by separating tabs and
rotating to converge blue with red.
Adjust the R&B and R&B&G pole magnets: by
separating tabs and rotating to converge blue and red
(magenta) with green.
Note: Precise

Purity Adjustment

When the Receiver is in the Service Mode, press the
Recall button on the Remote Control to enter Purity
Check. (See the Service Adjustments Electronic
Controls procedure).
Operate the Receiver for 60 minutes using the first
Purity Check field (white screen) to stabilize the CRT.
Fully degauss the Receiver by using an external
degaussing coil.
Press the Recall button on the Remote Control again
until the Purity Check (green screen) appears.
Loosen the deflection yoke clamp screw and move the
deflection yoke back as close to the purity magnet
as possible.
- 16 -
Voltage is 30.55kV ± 1.25kV.
Center line
from pattern
Mechanical
Center Marks
Vertical Raster Shift tabs
Figure 12.
Vertical Raster Shift Adjustment
(4 pairs of rings assembly)
convergence
not important.
.
Open the
same angle
from center
at
this
point
is

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ct-27sx11ueCt-27sx11ceCt-27sx31eCt-27sx31ueCt-27sx31ce

Table of Contents