Install The Hub; Installation Procedures; Prepare The Site - NETGEAR EN308TC Installation Manual

Ethernet hub
Hide thumbs Also See for EN308TC:
Table of Contents

Advertisement

Normal/Uplink Push Button for Port 8

Installation Procedures

Installation Procedures

Prepare the Site

1. Prepare the Site
Characteristic
Requirement
Temperature
Ambient temperature between 0 and 40 C (32 and 104 F).
No nearby heat sources such as direct sunlight, warm air
exhausts, or heaters.
Operating humidity
Maximum relative humidity of 90%, noncondensing.
Ventilation
Minimum 2 inches (5.08 cm) on all sides for cooling.
Adequate airflow in room or wiring closet.
Operating
At least 6 feet (1.83 m) to nearest source of electromagnetic noise
conditions
(such as photocopy machine or arc welder).
Service access
Minimum 12 inches (19.68 cm) front and back for service access
and maintenance.
Front and back clearance for cables and wiring hardware such as
punchdown blocks.
Power
Adequate power source within 6 feet (1.83 m).
Wiring hardware
Wiring hardware, such as punchdown blocks or patch panels,
should be complete before installing the hub.

Install the Hub

2. Install the Hub
Model EN308
Ethernet Hub Installation Guide