Download Print this page

Lennox ML193UHE Series Unit Information page 38

Hide thumbs Also See for ML193UHE Series:

Advertisement

(Trap at coil is optional)
Drain Pan
Piping from furnace and evaporator coil must slope down a minimum 1/4" per ft. toward trap
Furnace with Evaporator
Coil Using a Common Drain
(Trap at coil is optional)
(1" min. to 2" Max.above
condensatedrain connection)
Condensate
Drain Connection
FIGURE 51
(Trap at coil is optional)
Drain Pan
Furnace with Evaporator Coil Using a Separate Drain
(Unit shown in horizontal left-hand discharge position)
Evaporator
Coil
Condensate
Drain Connection
Evaporator drain
line required
Furnace with Evaporator Coil Using a Common Drain
(Unit shown in horizontal left−hand discharge position)
Evaporator
Coil
Condensat e Drain
Connection
Piping from furnace and evaporator coil must slope
down a minimum 1/4" per ft. toward trap
4"min
5"max
5' max.
PVC Pipe Only
FIGURE 50
When combining the furnace and evaporator coil
drains together, the A/C condensate drain outlet must
be vented to relieve pressure in order for the furnace
pressure switch to operate properly.
4"min
5"max
5' max.
PVC Pipe Only
FIGURE 52
Page 38
Field Provided Vent
(4" min. to 5" max. above
condensate connection)
.
IMPORTANT
(4" min. to 5" Max.above
condensatedrain connection)

Hide quick links:

Advertisement

loading