Quick Evaluation Before Installation - Cobra CPI-2500 Operating Instructions Manual

2500 watt power inverter
Table of Contents

Advertisement

Quick Evaluation
Before Installation
Introduction

Quick Evaluation Before Installation

This section provides you with basic information about
the inverter and how to check its performance before
installation.
Be Sure to Have on Hand:
A 12 volt DC power source (such as a vehicle battery).
1. The power source must provide
Power Supply
between 11 and 15 volts DC and
be able to supply enough current
to run the test load. As a rough
guide, divide the wattage of the
test load by 10 to get the current
(in amperes) the power source
must deliver.
A set of cables to connect the power source to the
inverter (not included).
The cables must be as short and thick as possible in
order to reduce the voltage drop between the power
source and the inverter when drawing current from
the power source.
If the cable suffers an excessive voltage drop, the inverter
may shut down when drawing higher currents because
the voltage at the inverter dropped below 10 volts.
#4 AWG stranded copper cable is recommended.
It should be no longer than 1.5 meters (4 ft.).
The end of the cable that connects to the inverter must
have its insulation stripped off for about
back from the end, exposing the bare copper.
The other end of the cable, which connects to the power
source, must be terminated with a lug or other connector
that provides a secure, low resistance connection.
For example, if the power source is a battery, the cable
must be terminated with a battery terminal that clamps
to the post on the battery.
English
4
1
inch (1.25 cm)
2
Quick Evaluation
Before Installation
Introduction
A test load that can be plugged into the AC receptacle on
the inverter for short term testing at a low power level.
The following cables are recommended for testing low
power level test loads only.
Test Load
Power
Test Load
100w
250w
500w
To Check Your Inverter's Performance Before Installation:
1. Turn the inverter Off (see page 14
On/Off Switch to Off
for details). If the power source is
a DC power supply, switch it Off
as well.
2. Connect cables to Power Input
Connect Terminals
Terminals (see page 8 for details).
3. Connect cables to power source
(see page 8 for details).
4. Check to make sure all
Connect Power Source
connections are secure.
5. Turn the inverter On. If the
power source is a DC power
supply, switch it On first.
On/Off Switch to On
6. Plug in the test load.
The inverter should supply power
to the load. If the inverter is not
working properly, refer to the
Troubleshooting Guide on page 18
Connect Test Load
or Power and Protection Indicators
section on page 16.
Nothing comes close to a Cobra
Minimum
Cable Size
# 16 AWG copper
# 12 AWG copper
# 8 AWG copper
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents