Mercedes-Benz A Series Owner's Manual page 258

Table of Contents

Advertisement

Open flap
2
on the electric air pump.
X
Pull connector
5
and air pump hose
X
from the housing.
Screw air pump hose
6
onto flange
X
TIREFIT filler bottle 1.
Place TIREFIT sealant filler bottle
X
downwards into recess
3
of the electric
air pump.
Filler hose
8
Valve
9
Remove the cap from valve
9
X
tyre.
* optional
6
7
of
1
head
Pressure release screw
a
Pressure gauge
b
Make sure pressure release screw
X
pressure gauge
Screw filler hose
X
Insert plug
5
X
rette lighter* (
power socket in your vehicle .
Turn the key to position 2 (
X
the ignition lock.
on the faulty
Press on/off switch
X
pump to I.
The electric air pump is switched on. The
tyre is inflated.
i
First, TIREFIT is pumped into the tyre. The
pressure can briefly rise to around 5 bar.
a
on
b
is fully closed.
8
onto valve 9.
into the socket of the ciga-
page 163) or into a 12 V
Y
page 62) in
Y
4
on the electric air
Practical advice
Do not switch off the electric pump dur-
ing this phase.
Let the electric pump run for five minutes.
X
The tyre should then have a pressure of at
least 1.8 bar.
!
Do not operate the electric air pump for
longer than eight minutes at a time without
a break. Otherwise, it may overheat.
The air pump can be operated again once
it has cooled down.
If a pressure of 1.8 bar is not reached after
five minutes:
Switch off and disconnect the electric air
X
pump and drive the vehicle forwards or
backwards approximately 10 m.
This distributes the TIREFIT more evenly.
Remove TIREFIT sealant filler bottle
X
from the electric pump.
Pump up the tyre again.
X
G Risk of accident
If a pressure of 1.8 bar is not achieved after
five minutes, the tyre is too badly damaged.
Do not drive any further. Consult a qualified
specialist workshop which has the neces-
sary specialist knowledge and tools to carry
out the work required. Mercedes-Benz rec-
Flat tyre
1
Z
255

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents