Tools And Materials; Before You Begin - Kohler K-1108 Installation Manual

Flanged acrylic bath with integral apron
Table of Contents

Advertisement

Available languages

Available languages

Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few minutes to review this manual before
you start installation. If you encounter any installation or performance problems, please don't hesitate to
contact us. Our phone numbers and website are listed on the back cover. Thanks again for choosing Kohler
Company.

Tools and Materials

Tape
Safety
Measure
Glasses
Claw
Hammer
Drill / Drill Bits

Before You Begin

CAUTION: Risk of product damage. Do not support the bath by the rim.
Observe all local plumbing and building codes.
Unpack and inspect the bath for damage. Return the bath to the carton until installation.
Before installation, ensure proper access to the final plumbing connections.
The integral apron is designed so the finished wall material [1-1/2" (3.8 cm) maximum] will overlap
the apron columns. The finished floor material [2" (5.1 cm) maximum] should butt up against the
apron.
This bath is designed for alcove installation.
Confirm adequate support for a rim mounted faucet; large faucets that may be inadvertently used
as a means of support are not appropriate or safe for this installation.
Kohler Co. reserves the right to make revisions in the design of products without notice, as specified
in the Price Book.
1014139-2-D
Pencil
Level
Knife
Square
Plus:
Sealant
• #6 Large-head galvanized nails
• Conventional woodworking tools and materials
• Drop cloth
• Construction adhesive (optional)
• Cement or mortar (optional)
• 2x4's or 2x6's
• Water-resistant wall material
• Rag
2
Kohler Co.

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-1123K-1125K-1150K-1184

Table of Contents