Panasonic CS-A18CKH Service Manual page 55

Table of Contents

Advertisement

11.1.2. Pumping down
Procedure:
1. Confirm that both the 3-way valves are set to the open
position.
• Remove the valve caps and confirm that the valve caps
are in the raised position.
• Be sure to use a hexagonal wrench to operate the valve
stems.
2. Operate the unit for 10 to 15 minutes.
3. Stop operation and wait for 3 minutes, then connect the
manifold gauge to the service port of the 3-way valve as
shown above.
• Connect the manifold gauge to the gas side service
port.
4. Air purging of the charge hose.
• Open the Low pressure side valve of manifold gauge
slightly to purge air from the charge hose.
5. Set the liquid side (High side) 3-way valve to the close
position.
6. Operate the air conditioner at the cooling cycle and
stop it when the gauge indicates 0.1 MPa.
• If the unit cannot be operated at the cooling (weather is
rather cool), press the Pump Down switch on the Indoor
unit.
• So that the unit can be operated.
7. Immediately set the gas side (Low side) 3-way valve to
the close position.
• Do this quickly so that the gauge ends up indicating 0.1
0.3 MPa.
8. Disconnect the manifold gauge, and mount both the
3-way valve's caps and the service port caps.
• Use torque wrench to tighten the service port nut to a
torque of 18 N.m.
• Be sure to check for gas leakage.
55
CS-A18CKH CU-A18CKH / CS-A24CKH CU-A24CKH

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu-a18ckhCs-a24ckhCu-a24ckh

Table of Contents