Epson OP1 Safety And Installation page 22

Operator panel
Hide thumbs Also See for OP1:
Table of Contents

Advertisement

2. Installation
(4) Secure the screws of the mounting
metal hasps.
Tighten the four screws slowly, in
an even, crisscross pattern.
Overtightening the screws may
damage the Operator Panel.
To ensure drip-proof performance,
the appropriate tightening torque is
0.5 Nm.
NOTE
Check the tightening torque again approximately 10 minutes after tightening the
screws.
14
OP1 Safety and Installation Rev.3

Advertisement

Table of Contents
loading

Table of Contents