Nokia ONT Product Manual page 85

Hide thumbs Also See for ONT:
Table of Contents

Advertisement

Install a G-2426G-B indoor ONT
Connect a UPS to a G-2426G-B ONT
6
Verify the "System Status" LED is "ON" with green illumination.
Ensure that the "System Status" LED is only the one in green illumination. If any other LED is
illuminated recheck the battery pack is seated and ensure that all wiring from UPS to
G-2426G-B ONT is installed correctly as listed by ONT specific instructions.
E
ND OF STEPS
June 2021
Issue 1
3FE-49441-ABAA-TCZZA
Nokia ONT
85

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G-2426g-b

Table of Contents