Measuring With The Rack Template - HP HPE Synergy 12000 Frame Setup And Installation Manual

Hide thumbs Also See for HPE Synergy 12000 Frame:
Table of Contents

Advertisement

Measuring with the rack template

Measuring with the rack template
The HPE Synergy 12000 Frame Rack Template ships with the frame. The rack template provides detailed instructions on where to
position the frame and rack rails, and where to install the cage or clip nuts. Each frame kit includes the rack rails recommended for that
frame.
NOTE: Four cage nuts and four clip nuts are included with the frame. Always use cage nuts in racks with square holes.
NOTE:
Always use clip nuts in racks with round holes.
When installing multiple frames, install the rack rails and cage nuts for one frame, and then install the frame. Repeat for each additional
frame.
Procedure
Procedure
1. Install lower cage nuts (left and right) in the front of the rack at the bottom of the fourth U (10 holes up on the template).
2. Install the upper cage nuts (left and right) in the front of the rack at the bottom of the tenth U (28 holes up on the template).
3. Install the rack rails.
Measuring with the rack template
72

Advertisement

Table of Contents
loading

Table of Contents